Brief Description: Clamp VS in place for drilling.
With the VS all measured out and clamped, its time to drill the VS aft spar to the fuselage. These images just show the VS clamped in its final position. Image 3 shows the VS forward spar clamped in an arbitrary position. We’ll locate and drill the forward spar later.