Brief Description: Fabricate F-712D up elevator stop. Part 2.
To continue fabricating the F-712 up elevator stop I marked and drilled the holes. All to #30 at this stage. Once again I found use for my lathe and new milling attachment. I could have match drilled these holes through scrap like I have been doing but I just wanted to try using the new attachment. 3 axis control on the part once its clamped in, I was able to get the drill bit in the center of the marked location easily.