KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-6A/7A Web Site
' style=
Date:  6-4-2010
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Drill top forward holes in top skin to #30. Part 2

Again, these holes are pre punched to the smaller #40. All 16 holes need to be drilled to the larger #30 hole. Notice in image 3, the 8 holes on the right are counter sunk deep enough to make the rivet flush where as the 8 holes on the left are counter sunk a bit deeper to except the dimples of 3 layers above it (gusset, bulkhead and skin).
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.