KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-6A/7A Web Site
' style=
Date:  2-20-2010
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Fit F-721-A forwad canopy deck.

In fitting the F-721A forward canopy deck I was not sure how to locate it for and aft. So I put the whole top forward section together, including the instrument panel to help out. it’s good to see where were going and to get an actual 3D model of what’s coming. In the end I will not need to trim the length of either the F-721A or B. The length of both are fine as is.

While I was at it I installed my EFIS. Not really. It’s a full size picture of the new Dynon Skyview EFIS. I’ll be using MGL’s EFIS but didn’t have a picture of it.
' style=

Fit F-721A forward canopy deck.

Fit F-721A forward canopy deck.

' style=

Install the EFIS.

Install the EFIS.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.