KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
' style=
Date:  2-6-2014
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Empennage

First of all... I completed all the paper work for the airworthy inspection.
Submitted the docs to my DAR and he contacted me today Docs were accepted by the FAA.
The inspection is scheduled for March 15th as of this writing.

Contacted the State of Florida Tax agency and figured out the taxes.

Today: Fabricated the elevator trim tab hinge pin. Installed and safety wired.
Terminated the trim motor wiring and tested.
Terminated the Nav / Strobe lights on the rudder. Installed the bottom rudder cap.
Installed the fiberglass tips on the elevator and horizontal stab.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.