KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
' style=
Date:  11-12-2013
Number of Hours:  4.00
Manual Reference:  Sec 12 DWG 45
Brief Description:  Cowling

More work on the cowling...
Matched the upper and lower cowling.
Measured and aligned the hinges, began by using a rotary file to create the access holes for the stainless steel hinge pins. I installed cowling on the fusealge and drilled the hinges in place.
This worked for me to make sure everything was held in place exactly how it will be in operation.

The cowl and spinner clearance is 1/4" as required.
' style=

RIght Side

RIght Side

' style=

Left Side

Left Side

' style=

Spinner Gap 1/4

Spinner Gap 1/4"

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.