KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
' style=
Date:  8-29-2013
Number of Hours:  4.50
Manual Reference:  Sec 9 DWG 41/42/43
Brief Description:  Canopy Work

Roll the RV out into the Florida afternoon sun... To relieve any stresses for the clamps.
I rolled it back into the garage after a couple hours... Surprising how hot everything was.
I could barely touch it... anyway the plexi was warm and flexible. I drilled the canopy to the center frame and rolled it back out into the sun to allow the canopy relax.
Repeated the process for the front part of the frame.
' style=

Center Frame Drilled

Center Frame Drilled

' style=

Front Canopy Frame

Front Canopy Frame

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.