I finally figured out the routing for the fuel and brake lines... I decided to take both lines in front of the gear mount then route it back through the guides. My problem is... I like parallel uniform lines, so after a few proto-types I have it the way I like.
Just need to finish the fuel valve, final assemble and tighten everything up... pull a vacuum to check for leaks.