KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
' style=
Date:  6-10-2012
Number of Hours:  6.00
Manual Reference:  Sec 8 DWG 34A
Brief Description:  Fuel / Brake Lines

Big day!!
Fabricated the brake lines, I decided to use a bulkhead union as pictured.
Installed the bosst pump and frabricated the fuel lines as pictured in #1 & #2 photo...
The -7A model landing gear mounts present a unique challenge, I just could not see trying to weave the lines behind and thread the holes as described in the plans, Gee Wizz...
I like what I came up with, and I also plan to use a bulkhead union at the pass through.
' style=

Brake and Fuel Lines

Brake and Fuel Lines

' style=

Bulkhead AN / Routing

Bulkhead AN / Routing

' style=

Fuel line Pass Through

Fuel line Pass Through

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.