KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
' style=
Date:  3-13-2011
Number of Hours:  1.00
Manual Reference:  Sec 7-9 DWG 13A
Brief Description:  Left Wing

I began by fitting the left bell crank, making sure the brass bushing had the proper clearances.
organized the pilot / AOA plumbling and studied the best routing within the wing.
I have not drill any holes yet... I want to look at this carefully... I have a good idea what I want to do.
' style=

AOA Plumbing

AOA Plumbing

' style=

Pitot / Static Plumbing

Pitot / Static Plumbing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.