KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
' style=
Date:  1-25-2014
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Installed Ailerons

Installed the left and right ailerons... torqued all the bolts.
Started the rigging process... it took about an hour to get everything lined up,
all the flight controls installed, free and correct, and operate smoothly.
I will have to go back and tweak as needed once I get the flaps installed.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.