Continued to terminate all the switches and ground wires. Powered the system up and checked each switch to make sure of operation via the VP-X configurator and the Dynon system. Allowed the system to fully charge the Skyview backup battery. Removed system power, Skyview detected and began the 30 second countdown. I set the skyview to continue on backup power and timed until shutdown, about 1hr 25min. Slowly finalizing the wire runs, cleaning up and tie wrapping the runs.