Continued to pin out the VP-X J1 Dsub connector... labeled wires. Completed all pin assignments, installed heat shrink, and installed insolated Dsub case. Temporarily installed the pitch trim servo, and connected to the VP-X and tested functionality. The VP-X is now completed pinned out. I have about 95% of all the electrical tested. I still need to run wires for the wing landing, position, and strobe lights to the wing root.
The 37 pin Dsub connector supplied by Dynon is pinned out for a more conventional electrical system. The VP-X manages many functions within the "Red Box", so I removed many of the pins / wires that will not be required in my electrical system.