KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
' style=
Date:  7-19-2012
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Firewall system Installation

Fabricated the copper strip that connects the Master selnoid to the Starter selnoid.
Test fit, and checked alignment... I will put some heat shrink around the exposed section.
Installed the heater box, and made sure to position it so the heat would be distributed evenly between the left and right seats. Can you imagine if my feet are warm and my passengers are cold.
I installed the engine mount to check clearances.

BTW... Cutting a 2" hole through the fire wall was a fun task...
There is a saying... "Have to right tool for the job" in my case I DID NOT have the right tool.
I need to invest in a hole punch tool to do the rest of the firewall work.

It turned out just fine, but it took me about an hour to cut 1 hole...
' style=

Heater Box

Heater Box

' style=

Offset for Center Discard in Cockpit

Offset for Center Discard in Cockpit

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.