I had another long day in the shop. I started by completing the last of the CBs, they all have wire attached now. I then lace tied everything up and anchored the vertical runs to the side of the fuselage.
I pulled the shielded cable for the headset and microphone jacks, this took a bit of time, the shielded cable is thick and it had to go through an “S” bend is some corregated conduit. I will solder the jacks up later.
After running some errands I came back and pinned all of the instrument panel grounds as well as the large wire grounds at the firewall, these are for the radios. This took some time because I did not think to label the grounds beforehand, I had to use a meter and trace which ground wire went to which box. I eventually sorted it all out.
Next I pinned the DSAB wires, this make the network that allows all of the Dynon units to talk to one another. After pinning the DSAB wires wrong I corrected it and called it a day. I even had a label, “green” on top “blue” on the bottom row, tired I guess. Soon there will be power to everything. Yippee!
All CB are wired.
Ground bus for the low power items.
You can see the right two pairs are backwards, not the orange label.