KitLog pro

Powered By Kitlog Pro v2.0

RVGator
Work Logs Found: 939
Category Work Time: 2920 Hours
 Date
Hours
Work Log Summary

Details

 12-14-2012
0.00
Video from 4th flight
Details

 12-12-2012
0.00
Yippee!
Details
       

 12-11-2012
2.75
Installed new Fuel Press Sender
Details

 12-10-2012
6.75
Stuff while waiting for Wx to clear
Details

 12-09-2012
7.25
More first flight preperations
Details
       

 12-08-2012
8.25
First flight training and final prep
Details

 12-07-2012
4.75
Mag timing and first flight preperation
Details

 12-06-2012
7.00
Spinner, Oil, Timing
Details
       

 12-05-2012
1.50
Foil inside cowl
Details
     

 12-05-2012
0.00
First Flight Training
Details

 12-04-2012
3.00
Cowl sealing
Details

 12-03-2012
2.75
Installed inspection covers tail and wing
Details
       

 12-02-2012
7.50
Airworthiness Inspection - PASSED
Details
       

 12-01-2012
10.00
Pre-Inspection work
Details
       

 11-30-2012
6.00
CB Panel decals
Details
     

 11-29-2012
7.00
Cockpit labels
Details
       

 11-28-2012
3.00
Seal inside of cowl
Details

 11-27-2012
5.75
Trouble shoot fuel system
Details
       

 11-27-2012
2.25
Set Alt Belt Tension
Details
       

 11-26-2012
3.75
Test Fuel System
Details

 11-25-2012
4.75
Oil Door / Prop bolts
Details
       

 11-24-2012
4.75
Required Placards
Details
       

 11-23-2012
3.25
Nothing accomplished
Details
     

 11-21-2012
4.75
Finished Gear slot filler
Details
       

 11-20-2012
3.50
Cowl slot filler piece U-816
Details
       

 11-16-2012
5.00
Weight and Balance
Details
       

 11-14-2012
3.00
Tested cowl fit with all seals
Details
       

 11-13-2012
2.75
Inlet baffel seals
Details
       

 11-11-2012
3.00
Engine stuff
Details
       

 11-10-2012
5.25
Tail fairing final fit / gas tank flush
Details
       

 11-09-2012
3.00
Lower cowl fasteners / Defuel rig
Details
       

 11-08-2012
6.00
Seat belt / heat SCAT tubes
Details
       

 11-07-2012
2.25
Installed oil breather tube
Details
       

 11-06-2012
4.75
Installed rudder, riveted on rear baggage floor
Details
       

 11-05-2012
4.75
Installed nut plate and tapped holes for tail fair
Details
       

 11-04-2012
6.00
Fit Emp Fairing
Details
       

 11-02-2012
5.50
Rivet baffle seal
Details
       

 11-01-2012
3.00
Secured CHT/EGT wires
Details
       

 10-31-2012
2.75
Baffle seal fitting
Details
       

 10-28-2012
2.50
Installed oil cooler
Details
       

 10-27-2012
10.00
Install exhasut and sensor wires
Details
       

 10-26-2012
6.50
Baffle threaded rods
Details
       

 10-25-2012
3.75
GPS Shelf
Details
       

 10-24-2012
6.50
Secure engine wires
Details
       

 10-23-2012
6.25
Right side plug wires
Details
       

 10-22-2012
4.50
Spark Plug wires/Sump heater
Details
       

 10-21-2012
4.50
Purge valve cable
Details
       

 10-20-2012
2.50
Drilled EGT hole in exhaust
Details
       

 10-16-2012
5.75
Finished FAB
Details
       

 10-11-2012
4.25
Cut and glassed inlet scoop hole
Details
       

 10-10-2012
4.75
Riveted FAB, prepared for some glass work
Details
       

 10-09-2012
2.00
Paint FAB
Details
       

 10-08-2012
3.75
Baffle clips and other stuff
Details
       

 10-06-2012
6.00
Riveted front baffle
Details
       

 10-05-2012
6.75
Front Baffle / Alt Air Door
Details
       

 10-04-2012
8.00
Riveted L/R aft baffle
Details
       

 10-03-2012
4.50
Baffle and FAB work
Details
       

 10-02-2012
4.50
Primed baffle
Details
       

 10-01-2012
5.00
Baffle prep for primer
Details
       

 09-30-2012
2.75
FAB bottom fit
Details
       

 09-29-2012
5.50
FAB fitting
Details
       

 09-28-2012
5.50
Began FAB
Details
       

 09-27-2012
6.25
Starter wire, Fuel Flow sensor
Details
       

 09-26-2012
5.50
Alternator/Starter wires at firewall.
Details
       

 09-25-2012
7.00
More engine connections
Details
       

 09-24-2012
3.75
Wired P-Mag connections
Details
       

 09-23-2012
3.00
Hooked up Man Pressure wires
Details
     

 09-22-2012
6.75
Hooked up Fuel Press, Oil Press and Oil Temp
Details
       

 09-21-2012
2.00
Purge return and cooling tube
Details
       

 09-20-2012
5.00
Baffle Brace
Details
       

 09-19-2012
7.50
Oil cooler corner brace
Details
       

 09-18-2012
7.00
EAA Inpection, Oil cooler doubler
Details
       

 09-17-2012
6.50
Cut upper baffle for gap
Details
       

 09-16-2012
5.00
Marking the contour with upper cowl.
Details
       

 09-15-2012
6.75
Corner gusset, trim top
Details
       

 09-14-2012
7.00
Front center baffle
Details
       

 09-13-2012
5.25
Baffle behind spinner
Details
       

 09-12-2012
5.25
Front baffle work
Details
       

 09-11-2012
5.75
Tested instrument panel
Details
       

 09-04-2012
6.25
Completed wing tips
Details
       

 09-03-2012
6.00
Prepared right wing tip for nut plates
Details
       

 09-02-2012
6.75
Left wing tip nut plates
Details
       

 08-31-2012
7.25
Tip lens, wing wires
Details
       

 08-30-2012
5.25
Wired right wing lights
Details
       

 08-30-2012
3.50
Door Open Sensor
Details
       

 08-29-2012
4.50
2. NAV/STROBE and Landing lights
Details
       

 08-29-2012
3.00
1. Baggage door latch blocks
Details
       

 08-28-2012
8.00
New Baggage door
Details
       

 08-27-2012
8.25
Fit wing tip ribs
Details
       

 08-26-2012
6.50
Initial fit of wing tips
Details
       

 08-25-2012
0.75
2. Rudder cable fairings
Details
       

 08-25-2012
8.50
1. Made new baggage door
Details
       

 08-24-2012
4.50
Installed Pitot, wired roll servo started emp. fai
Details
       

 08-23-2012
7.75
Installed VS and Flaps
Details
       

 08-18-2012
9.25
Installed elevator tested trim
Details
       

 08-17-2012
6.00
Primed tips hooked up tail light
Details
       

 08-16-2012
6.25
Riveted rudder bottom
Details
       

 08-15-2012
3.00
Elevator rigging and more glass work
Details
       

 08-14-2012
6.25
Elevator fit and movement
Details
       

 08-13-2012
6.75
Mounted elevator and fit wire to tail light
Details
     

 08-11-2012
6.75
Made attachment for tail light
Details
       

 08-10-2012
5.25
Riveted on elevator tips
Details
       

 08-09-2012
6.50
Installed elevator trim servo and wire
Details
       

 08-08-2012
6.75
VS, rudder pedals, & switch console
Details
       

 08-07-2012
7.75
Fuel lines and console
Details
       

 08-06-2012
7.75
Aileron push rods and front floor
Details
       

 08-05-2012
3.25
Installed Horizontal Stab
Details
       

 08-01-2012
4.50
2. Riveted on floor.
Details
       

 08-01-2012
1.75
1. Made wing connections.
Details
       

 07-31-2012
7.50
Final fit the wings
Details
       

 07-30-2012
3.75
Prepared for wing install tomorrow
Details
       

 07-29-2012
0.25
Sanded left elevator tip
Details

 07-29-2012
4.00
Closed tank and leak tested
Details
       

 07-25-2012
1.25
2. More elevator tips
Details
       

 07-25-2012
3.75
1. Splice wires to wing
Details
       

 07-24-2012
3.00
2. Riveted on flap fairings
Details
       

 07-24-2012
0.75
1. More elevator tip work
Details
       

 07-23-2012
0.25
3. Pulled Pitot/AOA lines
Details
       

 07-23-2012
1.75
2. Tail Inspection Covers
Details
       

 07-23-2012
2.75
1. Laid elevator tip ends
Details
       

 07-19-2012
3.25
2. See thru Tail Inspectoin cover
Details
       

 07-19-2012
1.50
1. Primed flap fairing/ Pitot lines
Details
       

 07-18-2012
6.25
Wing nut plates
Details
       

 07-17-2012
7.25
Installed upper wing nut plates
Details
       

 07-17-2012
1.00
1. More fuel sender tests
Details

 07-16-2012
2.50
2. Testing fuel senders
Details

 07-16-2012
0.50
1. Sanded VS tip layup
Details

 07-13-2012
0.75
4. VS tip end
Details
       

 07-13-2012
1.25
3. Wing root nut plate holes
Details
     

 07-13-2012
1.75
2. Dimpled holes for flap fairing
Details

 07-13-2012
3.50
1. Drilled rear spar to size
Details
       

 07-12-2012
4.25
VS tip and elevator tips
Details
       

 07-11-2012
3.25
Fixed flap bottom fit to belly
Details
       

 07-11-2012
4.00
Fit rudder top and bottom
Details
       

 07-10-2012
2.00
Riveted on step
Details
       

 07-09-2012
5.75
Cut hole for the step
Details
       

 07-08-2012
4.75
Fit flap fairings
Details
       

 07-07-2012
9.00
Wing root fairings
Details
       

 07-06-2012
5.75
Installed and rigged flaps
Details
       

 07-06-2012
1.00
2. Drilled bolt hole in tank supports
Details
       

 07-06-2012
2.50
1. Check Sweep, fuel vent lines
Details
       

 07-04-2012
2.75
2. Rig Ailerons
Details
       

 07-04-2012
4.75
1. Drilled Tank Support Brackets
Details
       

 07-03-2012
2.50
Installed wings first time!
Details
       

 07-02-2012
5.25
Ready work for wing install
Details
       

 07-01-2012
5.00
Wing stuff before fitting
Details
       

 07-01-2012
0.50
Sanded filler at corners
Details
       

 06-27-2012
0.00
Jack stands
Details
     

 06-23-2012
4.75
Made tank support brackets
Details
       

 06-22-2012
3.25
Riveted F804 Caps
Details
       

 06-21-2012
0.50
Added filler to corners
Details
       

 06-20-2012
0.00
Update
Details
       

 06-11-2012
4.25
Primed skirt and windscreen
Details
       

 06-09-2012
3.00
Last layer of neat resing to skirt
Details
     

 06-08-2012
0.25
Sanded filler on insde of windscreen
Details
     

 06-08-2012
1.25
Sanded & refilled rivets
Details
     

 06-06-2012
1.00
Filled underside of fairing some
Details
     

 06-06-2012
2.75
Filled rivet holes, faired handle area
Details
       

 06-06-2012
2.50
Baffle 6 - Trim Rt aft baffle
Details
       

 06-01-2012
0.25
Sanded filler at spinner
Details
       

 06-01-2012
1.25
Final layer of resing on WS
Details
       

 06-01-2012
1.25
Baffle 5 -Riveted Doubler
Details
       

 05-31-2012
1.75
Sanded front area to shape
Details
       

 05-31-2012
1.50
Laid on clear resin
Details
       

 05-31-2012
1.25
Filled skirt rivet centers
Details
     

 05-30-2012
3.00
Sanded Windscreen
Details
     

 05-29-2012
1.75
Started to fill pinholes
Details
     

 05-29-2012
2.50
Filler at spinner flange part 2
Details
       

 05-29-2012
1.75
Baffle 4- Fit Rt-Aft
Details
     

 05-28-2012
1.50
Filled at spinner flange
Details
       

 05-28-2012
1.50
Baffle 3 - Rivted plates fit 707D bracket
Details

 05-27-2012
1.00
Opened canopy with some effort
Details
       

 05-25-2012
3.50
Sanded down filler to shape
Details
       

 05-25-2012
0.75
Baffle 2 - Cyl 1,2,3 prep
Details
     

 05-24-2012
2.00
Baffle 1 - Cly 4 Prep
Details
     

 05-24-2012
1.75
Applied resin filler Mix
Details
       

 05-23-2012
5.50
Sanded winscreen fairing to shape
Details
       

 05-21-2012
7.00
Laid up upper faring
Details
       

 05-20-2012
1.00
2. Fill void behind cowl spinner flange
Details
     

 05-20-2012
0.50
1. Filled some of lower fairing
Details
       

 05-19-2012
0.50
2. Refined cowl fit.
Details

 05-19-2012
2.50
1. Pop riveted lower aft windscreen
Details
       

 05-17-2012
2.00
2. Started forward fit of cowling.
Details
       

 05-17-2012
3.00
1. Laid up lower aft windscreen fairing
Details
       

 05-16-2012
3.50
2. Started to lay up aft lower windscreen
Details
       

 05-16-2012
0.50
1. Finished riveting upper cowl hinge
Details

 05-14-2012
4.25
Riveted top cowl hinges
Details
       

 05-13-2012
5.75
Laid up lower windscreen fairing
Details
       

 05-12-2012
2.25
Glued upper cowl hinges
Details
       

 05-12-2012
3.50
Glassed extension to aft skin
Details
       

 05-11-2012
4.50
Riiveted lower cowl hinges
Details
       

 05-10-2012
0.75
Counter Sink lower cowl rivet holes
Details
     

 05-06-2012
2.50
2. Marked fairing location.
Details
       

 05-06-2012
1.50
1. Epoxied on lower cowl hinges
Details
       

 05-05-2012
4.00
Gap fix / hinge glue prep.
Details
       

 05-04-2012
1.00
2. Fixed skirt to windscreen transition
Details
       

 05-04-2012
0.50
1. Filled void in back of gap layup
Details

 05-03-2012
2.25
2. Taped up fairing edge
Details
       

 05-03-2012
1.25
1. Laid up glass to fix gap
Details
       

 05-02-2012
1.75
Drilled weep holes
Details
     

 05-01-2012
1.75
More paint gap work
Details
       

 04-30-2012
5.25
Set paint gap/removed prop
Details
       

 04-28-2012
6.50
Drilled long horizontal hinges to cowl
Details
       

 04-27-2012
2.75
Made upper cowl taper pins
Details
       

 04-25-2012
4.25
Trimed upper/lower cowl line
Details
       

 04-24-2012
4.75
Drilled lower cowl vertical hinges
Details
       

 04-22-2012
3.25
Set and drilled side hinges
Details
       

 04-21-2012
4.25
Trimed and drilled bottom of Cowl
Details
       

 04-20-2012
6.00
Slotted lower cowl
Details
       

 04-19-2012
4.25
Drilled upper cowl to firewall hinge
Details
       

 04-18-2012
7.75
Fit top cowl
Details
       

 04-17-2012
5.50
Installed prop to fit cowl
Details
       

 04-15-2012
1.50
2. Installed Velcro on glare shield
Details
       

 04-15-2012
1.00
1. Marked 2" reference line
Details
     

 04-13-2012
4.25
Initial cuts to fit cowls halves
Details
       

 04-12-2012
2.00
Riveted on upper hinge
Details
       

 04-11-2012
4.00
Upper hinge
Details
       

 04-10-2012
2.00
Worked on spinner mockup
Details
       

 04-09-2012
3.75
Drilled bag door hinge Lock and Latch
Details
       

 04-08-2012
0.00
Gettting ready at hanger
Details
       

 04-07-2012
1.00
Riveted door inner skin
Details
       

 04-06-2012
1.50
Canopy handle spring install
Details
       

 04-05-2012
1.00
2. Prosealed baggage door
Details
       

 04-05-2012
2.00
1. Added final layer of glue
Details
       

 04-03-2012
6.75
Glued windscreen
Details
       

 03-24-2012
2.00
Started to fit windscreen
Details
       

 03-23-2012
0.50
Part 2 Alt Static handle
Details
       

 03-23-2012
1.50
Part 1 Canopy Handle
Details
       

 03-22-2012
3.00
Installed (L) side Cherry rivets
Details
       

 03-21-2012
2.50
Painted Dash
Details
       

 03-20-2012
3.75
Riveted Top Skin longeron rivets
Details
       

 03-19-2012
2.50
Fit Canopy Latch
Details
       

 03-16-2012
1.75
Fitting baggage door
Details
       

 03-15-2012
5.50
Started to rivet boot cowl
Details
       

 03-14-2012
2.25
Installed Alt Air Cable
Details
       

 03-13-2012
1.00
Rivet side skin support
Details
     

 03-13-2012
1.00
Pitot Heat Warning
Details
       

 03-12-2012
4.25
Prepare to rivet boot cowl
Details
       

 03-11-2012
2.00
Air hose work
Details
       

 03-09-2012
4.75
G/S Antenna & Alt Static Air
Details
       

 03-07-2012
2.25
Wired F804 Cap lights
Details

 03-06-2012
2.50
Tested sensor circuits
Details
       

 03-04-2012
2.25
Re-installed CB and Inst Panels
Details
     

 03-03-2012
1.50
Battery hold down strap
Details
       

 03-02-2012
4.50
Riveted on skirt
Details
       

 03-01-2012
1.75
Part 2. Fuel Flow sensor and line
Details
       

 03-01-2012
2.25
Part 1. Fill Voids on skirt edge
Details
       

 02-29-2012
6.75
Glued on skirt (upper edge)
Details
       

 02-28-2012
2.75
Primed inside of skirt
Details
       

 02-27-2012
1.75
Primed inside of skirt
Details
     

 02-12-2012
0.50
Marked glue lines
Details

 02-11-2012
5.25
Sanded skirt and test fit
Details
       

 02-09-2012
3.75
Part 2 Hose and wire route test
Details
       

 02-09-2012
0.75
Part 1 Another coating of epoxy
Details
       

 02-08-2012
0.50
Part 3 Power wires
Details

 02-08-2012
0.75
Part 2 Wrapped some wire bundles
Details
       

 02-08-2012
1.75
Part 1 More aft skirt filling
Details
       

 02-07-2012
1.50
Part 4 Starter wire route
Details
       

 02-07-2012
1.50
Part 3 Left tank fuel line
Details
       

 02-07-2012
1.25
Part 2 Wire bundle tying
Details

 02-07-2012
0.25
Part 1 More dry micro on skirt
Details
     

 02-05-2012
0.75
Sanded aft skirt
Details
     

 02-04-2012
1.00
Applied more micro to aft skirt
Details
       

 02-03-2012
2.25
Sanded down epoxy coat from yesterday
Details

 02-02-2012
1.75
2. More wire tying
Details
       

 02-02-2012
2.00
1. Filled outside of skirt with epoxy
Details
     

 02-01-2012
1.00
2. Marked EGT probe positions
Details
       

 02-01-2012
1.50
1. Secured rear stick cable
Details
       

 01-28-2012
0.25
2. Painted underside of glare shield
Details
     

 01-28-2012
2.50
1. Removed uncured epoxy
Details
       

 01-27-2012
2.50
Installed cooling fan and guard
Details
       

 01-26-2012
1.50
Started Coolin Fan Guard
Details
     

 01-16-2012
1.50
Coated inside of skirt with resin
Details
       

 01-14-2012
3.25
Cooling Fan - ELT cable
Details
       

 01-13-2012
2.25
Continued Cooling Fan
Details
       

 01-12-2012
3.50
2: Drilled baggage wall for air pass thru
Details
       

 01-12-2012
2.25
1: Installed brake valve - tested (L) master
Details
     

 01-11-2012
1.25
2: Tested (R) Master and Park Valve for leaks
Details
     

 01-11-2012
0.75
1: More micro on duct
Details

 01-10-2012
0.50
Laid on dry micro to fair inlet
Details
     

 01-08-2012
0.75
Laid up new inlet duct
Details

 01-01-2012
1.00
2: Redo master cylinder fittings
Details
     

 01-01-2012
2.50
1: Sanded and formed cooling duct
Details
       

 12-31-2011
2.00
Glassed cooling duct
Details
       

 12-30-2011
0.50
Fitting into brake valve
     

 12-30-2011
2.50
Cooling duct
Details
       

 12-29-2011
1.50
More cooling fan work
Details
       

 12-28-2011
1.25
Equpment Cooling Fan
Details
       

 12-23-2011
1.25
Parking brake valve assembly
Details
       

 12-22-2011
5.50
Parking brake knob and fit
Details
       

 12-20-2011
3.00
Fabricating parking brake bracket
Details
       

 12-19-2011
0.75
Drilled out F866-D
Details
       

 12-17-2011
1.75
Parking Brake bracket
Details

 12-17-2011
2.00
1. Primer coat on underside of skirt
Details
       

 12-15-2011
1.75
Filled more on underside of skirt
Details
     

 12-13-2011
3.00
More work on underside of skirt
Details
       

 11-26-2011
0.50
Sanded aft end of skirt
Details
     

 11-14-2011
0.50
More fairing work
Details
     

 10-13-2011
1.00
Sanded off some of the underside shim
Details

 10-10-2011
0.50
2. Defrost, Equipment cooling
Details

 10-10-2011
0.50
1. Applied clear epoxy to underside of skirt
Details
     

 10-09-2011
1.00
Glassed underside of skirt seam
Details
     

 09-27-2011
0.50
Made handle bushing
Details
       

 09-26-2011
2.00
Shaped external handle
Details
       

 09-22-2011
0.00
Moved wings to airport
Details
       

 09-06-2011
1.50
Another slurry layer.
Details

 08-29-2011
0.50
Sanded aft section of skirt
Details
       

 08-22-2011
1.50
More liquid shimming
Details
     

 08-21-2011
2.75
Filled gap at the track
Details
       

 08-20-2011
2.00
Last layer on rear skirt seam
Details
       

 08-17-2011
0.75
Laid up middle of skirt seam
Details
       

 08-16-2011
1.50
Laid up first layer to skirt halves
Details
       

 08-15-2011
1.25
Cleaned up shims
Details
       

 08-14-2011
0.75
2. Set windscreen edge
Details
       

 08-14-2011
1.50
1. Shimmed vertical parts of skirt
Details
       

 08-13-2011
1.25
Filled goofed up holes
Details
       

 08-09-2011
2.50
Canopy front edge
Details
       

 08-01-2011
3.75
Upper skirt gap work
Details
       

 07-25-2011
2.50
Trimmed lower side of skirts
Details
       

 07-21-2011
5.25
Matching skirt "S" curve
Details
       

 07-19-2011
5.50
More work on the skirt
Details
       

 07-18-2011
5.00
Fit aft skirt section.
Details
       

 07-17-2011
3.25
Fuel pump fittings
Details
       

 07-16-2011
0.75
2. Engine sesnors
Details
       

 07-16-2011
3.75
1. Fwd Baggage conduit
Details
       

 07-15-2011
4.00
Check valve bracket
Details
       

 07-14-2011
0.50
2, Tested purge valve cable
Details
       

 07-14-2011
2.25
1. Purge line Check Valve
Details
       

 07-13-2011
6.00
Drilled anchor block and rollers
Details
       

 07-12-2011
6.50
Wing NACA vent
Details
       

 07-10-2011
4.00
Cabin heat Cable
Details
       

 07-09-2011
1.00
2. Paint NACA vent and air vent cover
Details
       

 07-09-2011
2.25
1. Purge valve cable anchor bracket
Details
       

 07-08-2011
0.00
2. Oil filler tube move.
Details
       

 07-08-2011
6.75
1. Heat valve cable support
Details
       

 07-07-2011
0.00
2. Rear throttle and cable eyeballs
Details
       

 07-07-2011
8.25
1. Mixture cable
Details
       

 07-06-2011
0.75
2. Installed front NACA vent
Details
       

 07-06-2011
3.50
1. Install Roll Servo
Details
       

 07-05-2011
2.50
Throttle cable hook-up
Details
       

 07-02-2011
0.75
Fuel control bracket install
Details
     

 07-01-2011
0.50
Throttle/Mixture brackets
Details

 06-24-2011
1.50
Alternator
Details
     

 06-23-2011
3.00
2. Exhaust hangers
Details
       

 06-23-2011
1.25
1. Prop Cable
Details
       

 06-22-2011
1.75
Cable lengths
Details
       

 06-21-2011
1.75
Mixture pass thru
Details

 06-20-2011
4.75
Throt/Mix brackets done
Details
       

 06-13-2011
3.25
More mixture bracket work
Details
       

 06-09-2011
3.00
Cut out mixture bracket
Details
       

 06-08-2011
0.50
Took off prototype mixture bracket
Details

 06-07-2011
2.25
Prototype mixture bracket
Details
       

 06-03-2011
2.50
Settled on tail pipe position
Details
       

 06-02-2011
1.25
Exhaust
Details
       

 05-24-2011
0.75
Test fit Exhaust
Details
       

 05-23-2011
3.00
2. Throttle cable anchor
Details
       

 05-23-2011
4.00
1. Hung Engine Solo!
Details
       

 05-22-2011
2.50
Engine hanging day NOT!
Details
       

 05-21-2011
0.00
2. Prop Governor
Details
       

 05-21-2011
5.25
1. Fuel Pump fitting / SD20 install
Details
       

 05-20-2011
2.75
Made bracket for Manifold Pressure fitting
Details
       

 05-19-2011
1.00
2. Engine mount bolts
Details
       

 05-19-2011
2.00
1. Restrictor fitting
Details
       

 05-18-2011
2.00
Upper wire pass through
Details
       

 05-17-2011
3.00
Firewall items
Details
       

 05-16-2011
3.50
Finding where things go.
Details
       

 05-15-2011
2.25
More test fitting
Details
       

 05-09-2011
0.75
Removed govenor to ship back!
Details
       

 05-08-2011
2.75
Re-installed OFA
Details
       

 05-08-2011
2.00
Prop Governor Bracket
Details
       

 05-02-2011
2.00
Started to polish canopy tracks
Details
     

 05-02-2011
1.00
Removed OFA spacer
Details
       

 04-30-2011
0.00
Set up for engine install work
Details
       

 04-26-2011
1.75
Installed nose gear
Details
       

 04-25-2011
3.00
Main tires, nose gear leg
Details
       

 04-24-2011
1.50
Installed main gear legs
Details
       

 04-24-2011
3.00
Drilled mains for cotter pin
Details
       

 04-23-2011
1.00
Packed wheel bearings
Details
     

 04-23-2011
4.50
Installed eyeball pass throughs
Details
       

 04-22-2011
4.00
Installed shunt and ANL
Details
     

 04-21-2011
4.00
Fit main wheels and brakes
Details
       

 04-20-2011
2.75
Set fork breakout - started mains
Details
       

 04-19-2011
1.25
Installed nose gear flange and fork
Details
     

 04-18-2011
1.00
Lace tied wires
Details
       

 04-18-2011
2.75
Drilled nose gear leg
       

 04-14-2011
1.75
Hooked up fuel boost pump wires
Details
     

 04-14-2011
0.50
Heat valve control cable
Details
     

 03-27-2011
1.00
Part 2: Front power outlet
Details
       

 03-27-2011
6.00
Part 1: Finished heat vent
Details
       

 03-26-2011
5.75
Made heat vent bracket
Details
       

 03-25-2011
0.50
Part 2: Heat vent bracket
Details
     

 03-25-2011
3.25
Part 1: Removed panel, lace tied harness
Details
     

 03-23-2011
2.50
More RFI trouble shoting
Details
     

 03-20-2011
2.50
2. Landing gear prep
Details

 03-20-2011
3.75
1. Trouble shot RFI again
Details

 03-19-2011
4.50
E-bus feed diode and relay
Details
       

 03-18-2011
3.00
Hot Battery Bus items
Details
       

 03-17-2011
0.00
Part 2: Static sytem leak check
Details
       

 03-17-2011
4.00
Part 1: Trim speed switch Pitot, Static and AOA li
Details
       

 03-16-2011
2.75
Heat Valve, trim speed switch
Details
       

 03-11-2011
2.50
Solved DSAB drops
Details

 03-06-2011
1.75
Rear seat jacks
Details
       

 03-05-2011
3.25
PLT MIC now works, config AP
Details
       

 03-04-2011
4.75
PLT- headset jacks
Details
     

 03-04-2011
0.00
EAA Tech Counselor Inspection
Details

 03-03-2011
0.00
Replace molex for DB9
Details
       

 03-03-2011
5.25
Part 1: Updated Dynon Equipment
Details
       

 03-02-2011
6.25
Powered up the panel
Details
     

 03-01-2011
7.00
Grounds and DSAB
Details
       

 02-28-2011
8.75
New wire bundle support
Details
       

 02-27-2011
4.75
More wires and CBs
Details
       

 02-26-2011
3.25
Fixed broken wire, tied more wire!
Details
       

 02-25-2011
6.25
Conected 496 to intercom
Details
       

 02-24-2011
3.50
Installd new power wires to 430W
Details
       

 02-20-2011
5.25
GPS Dock and wire lace
Details
       

 02-16-2011
0.00
Part 2: 496 data cable
Details
       

 02-16-2011
5.25
Part 1: G496 Data Cable
Details
       

 02-15-2011
3.50
AP-74 wires
Details
       

 02-14-2011
2.50
Installed support clamp and stuff
Details
       

 02-12-2011
3.50
DRILLED FINGER!!
Details
     

 02-11-2011
4.75
Tied wire bundle
Details
       

 02-10-2011
2.25
Terminated right side switches
Details
     

 02-09-2011
4.75
Dynon serial plug holder
Details
       

 02-08-2011
0.00
Part 2; Re-installed left panel switches
Details
     

 02-08-2011
6.25
Part 1: Pliced comm wires
Details
       

 02-07-2011
1.25
DSAB bus Hub
Details
     

 02-06-2011
1.50
Made retainer bracket for HS34
Details

 02-05-2011
3.50
Mapped wires/Orgainize harness
Details
     

 02-01-2011
1.75
Installed Inst GND Bus
Details
       

 01-30-2011
2.00
Finished hard AOA/Pitot lines
Details
       

 01-29-2011
1.50
Flared Pitot/AOA tubes
Details

 01-16-2011
0.75
Flared pitot/AOA lines
Details
     

 01-09-2011
4.00
Start Arm decal and tested circuits
Details
       

 01-08-2011
2.50
Terminated more CB wires
Details
     

 01-07-2011
3.00
Terminated CB wires
Details
     

 01-05-2011
3.00
Organized wires behind CB panel
Details
       

 01-04-2011
4.25
Completed (R) console connections
Details
       

 01-02-2011
5.50
Molex connection to right console
Details
       

 01-01-2011
1.75
Front LED side lights
Details

 12-31-2010
2.25
Soldered wire to LED lights
Details
       

 12-30-2010
2.50
Pulled wires for Alt Field and IGN
Details
       

 12-29-2010
1.25
Finished label plate
Details
     

 12-28-2010
3.25
Re-painted CB panel
Details
       

 12-27-2010
2.50
Made Bracket for standoffs
Details
     

 12-22-2010
3.75
CB panel fit
Details
       

 12-19-2010
6.25
Right Console Molex connnections
Details
     

 12-18-2010
5.50
Re-layed out CBs
Details
       

 12-17-2010
3.25
Continued to wire (R) Console
Details
       

 12-16-2010
1.50
Molex connection on (R) console
Details

 12-15-2010
2.75
Connected Main Bus Feed
Details
     

 12-14-2010
1.50
Part 2: Wire organization
Details
       

 12-14-2010
2.75
Part 1: Front floor modification
Details
     

 12-13-2010
4.50
Spliced NAV/STRB, LAND and TAXI wires
Details
       

 12-12-2010
6.75
Hooked up remianing wires under seat
Details
       

 12-11-2010
2.50
Solder wires to switch
Details
       

 12-06-2010
4.25
Installed standoff
Details
       

 12-05-2010
1.75
Made stand off
Details
     

 12-04-2010
3.00
Tested Aileron Trim
Details
     

 11-30-2010
3.00
Tested Smart Start
Details
     

 11-29-2010
1.25
Drilled battery tray to floor
Details
     

 11-28-2010
6.25
WIre supports for E&E bay
Details
       

 11-27-2010
5.25
E&E Bay wires
Details
       

 11-26-2010
5.00
Connected Aileron Trim
Details
       

 11-24-2010
1.25
Installed Smart Start Arm button
Details
     

 11-22-2010
4.25
Wired sticks to terminal and tested
Details
       

 11-21-2010
3.50
Stick wire arrangement
Details
     

 11-20-2010
4.00
Wired servos to terminal
Details
       

 11-18-2010
4.50
Terminal for A/P servo wires
Details

 11-17-2010
3.00
Secured stick wires
Details
       

 11-15-2010
5.00
Terminal/relay tray under front seat
Details
       

 11-14-2010
7.25
Rear stick connector
Details
       

 11-12-2010
0.00
Put engine on stand
Details
       

 11-11-2010
1.00
Rear stick connector
Details
       

 11-11-2010
2.75
Part 1: Installed Prop Gov. and Oil Temp Sensor
Details
       

 11-09-2010
5.25
Rear control cover con't
Details
       

 11-08-2010
3.25
More Aft Control Cover
Details
       

 11-07-2010
3.00
Build first part of rear control cover
Details
       

 11-06-2010
6.00
Rear Control Cover con't
Details
       

 11-04-2010
1.50
New rear stick
Details
     

 11-03-2010
1.00
Rear control cover
Details
     

 11-02-2010
2.00
Rear stick grip
Details
       

 11-01-2010
2.75
Installed stick grips
Details
       

 10-31-2010
4.25
Solved friction in control mount
Details
       

 10-30-2010
3.25
Safety wired pitch servo
Details
       

 10-29-2010
1.25
Pitch servo wires
Details
       

 10-28-2010
4.00
Pitch Servo
Details
       

 10-27-2010
2.75
Made support for rear of radio stack
Details
       

 10-26-2010
1.75
Panel fitting
Details
       

 10-19-2010
3.00
More AOA/Pitot
Details
     

 10-13-2010
5.25
AOA and Pitot lines
Details
       

 10-12-2010
2.25
Strobe sync wire
Details
     

 10-08-2010
3.50
EMS harness fit and wire organization
Details
       

 10-07-2010
2.50
Rear power outlet and seat heat
Details

 10-06-2010
3.00
Left wire bundle Pitot AOA line route
Details

 09-30-2010
2.50
Front cockpit LED lights
Details

 09-29-2010
1.25
Set torque on roll bar bolts
Details
       

 08-08-2010
6.25
Finished (R) wing riveting
Details
       

 08-07-2010
6.00
Started to rivet (R) bottom skin
Details
       

 07-22-2010
7.25
Finished riveting (L) wing!!!
Details
       

 07-21-2010
3.75
And more wing skin riveting
Details
     

 07-20-2010
2.25
Continued riveting bottom skin
Details
       

 07-16-2010
4.25
Started to rivet (L) bottom skin
Details
     

 07-15-2010
2.25
Riveted on Map light mount
Details
       

 07-13-2010
1.25
Painted mount for Map Light
Details
     

 07-12-2010
3.25
Part II - Map light mount
Details
     

 07-12-2010
2.50
Part I - Clecoed skin for riveting
Details
     

 07-03-2010
3.25
Prepared wing skins for riveting
Details
       

 07-02-2010
4.50
RCP LED ligths
Details
       

 07-01-2010
4.00
Light in the rear baggage area
Details
       

 06-29-2010
0.50
Installed LED stirps
Details
       

 06-28-2010
3.75
Part II - Rear cockpit lighting
Details
       

 06-28-2010
1.00
Part I - Pitch Servo Hardware
Details
     

 05-30-2010
1.25
Cockpit lighting and Trim
Details
     

 05-28-2010
3.50
Heated seat wires
Details
       

 05-27-2010
1.50
Flap motor wire
Details
       

 05-26-2010
1.50
Part 2 Re-installing contols rods
Details
     

 05-26-2010
5.00
Part 1-Connectors on antenna cables & A/P wires
Details
       

 05-25-2010
0.75
Test fit new Dynon 10A EFIS
Details
       

 05-24-2010
3.25
Left side wire bundle
Details
       

 05-23-2010
4.00
More wire work!!!
Details
       

 05-22-2010
7.25
Electrical - More wires, and redos
Details
       

 05-21-2010
1.50
More Left side wire bundle
Details
       

 05-20-2010
4.50
Left side wire bundle standoff
Details
     

 05-03-2010
5.75
Finished aileron boots
Details
       

 04-27-2010
3.00
2. Started aileron boot rings
Details
       

 04-27-2010
3.25
1. Wire route for instrument panel harness
Details
     

 04-20-2010
1.25
Made bezel to hold ELT Control
Details
       

 04-19-2010
1.50
Primed/Pained (L) Gear mount
Details
     

 04-18-2010
0.50
Riveted rear shoulder strap anchors
Details
       

 04-07-2010
3.50
Electical wires continued
Details
       

 04-01-2010
4.00
Tested LED strip lights
Details
       

 03-31-2010
2.25
Wired CBs to Molex
Details
       

 03-31-2010
3.50
Touched up CB panel chips
Details
       

 03-30-2010
4.50
New wires to console swtiches
Details
       

 03-29-2010
3.25
Made bracket to hold Molex connector
Details
       

 03-28-2010
3.00
Wired console switches to CBs
Details
     

 03-27-2010
6.00
(R) console labels
Details
       

 03-26-2010
5.00
(R) Console Switches
Details
       

 03-25-2010
5.75
Wired Batt to Master Switch
Details
       

 03-24-2010
4.00
Install Engine Mount
Details
       

 03-23-2010
3.00
Installed firewall pass thru
Details
       

 03-22-2010
4.50
More polishing
Details
       

 03-21-2010
2.75
Started to polish belly
Details
       

 03-21-2010
1.00
Riveted antenna doublers
Details
       

 03-20-2010
3.50
Fixed aft spread of canopy frame
Details
     

 03-18-2010
5.50
Drilled Canopy Skirts
Details
       

 02-27-2010
6.75
Started Canopy Skirt
Details
       

 02-25-2010
3.00
Fit windscreen to roll bar
Details
       

 02-24-2010
2.75
Canopy gluing complete
Details
       

 02-23-2010
2.75
Prepared canopy for cosmetic layer of glue
Details
       

 02-21-2010
6.75
Glued on canopy
Details
       

 02-20-2010
2.25
Tape off canopy and frame
Details
       

 02-19-2010
6.50
Final fit of canopy
Details
       

 02-18-2010
4.00
THE BIG CUT
Details
       

 02-16-2010
4.75
More canopy fitting
Details
     

 02-15-2010
4.00
Canopy fitting
Details
       

 02-14-2010
1.50
Mounted nose wheel tire and tube
Details
       

 02-04-2010
1.50
Mounted main tires on wheels
Details
       

 02-03-2010
0.50
Main tire and wheel
Details
       

 02-02-2010
1.75
Trimming canopy flange
Details
     

 02-01-2010
2.75
Canopy stand
Details
       

 01-31-2010
4.00
Drilled Canopy Rails
Details
       

 01-30-2010
2.50
Outer skin of door done.
Details
       

 01-29-2010
1.25
Started to rivet baggage door
Details
       

 01-28-2010
6.50
Baggage door
Details
       

 01-27-2010
2.75
Fixed another QB mistake
Details
       

 01-26-2010
1.50
Worked on canopy handle/latch
Details
       

 01-25-2010
1.00
Canopy latch
Details
     

 01-24-2010
2.00
More canopy frame fitting
Details
       

 01-23-2010
7.50
Canopy frame started
Details
       

 01-20-2010
2.00
Rear Track done
Details
       

 12-29-2009
4.75
Riveted canopy track
Details
       

 12-21-2009
5.00
Continued Canopy track
Details
       

 12-20-2009
4.75
Started canopy track
Details
       

 12-19-2009
3.75
Primed parts & dimpled floor
Details
       

 12-18-2009
6.00
XPDR Antenna doubler and stuff
Details
       

 12-17-2009
5.75
Fitting VHF antennas
Details
       

 12-16-2009
1.00
VHF Antenna doubler
Details
     

 12-15-2009
5.00
Transponder antenna doubler
Details
       

 12-14-2009
4.75
VHF Antenna doublers con't
Details
       

 12-13-2009
4.50
VHF Antenna doublers
Details
       

 11-30-2009
1.75
2. Safety Trim module
Details
       

 11-30-2009
1.75
1. Installed ruder pedals
Details
     

 11-29-2009
3.25
Riveted on pedal extensions
Details
       

 11-28-2009
2.00
More wiring ideas
Details
       

 11-27-2009
2.00
2. Instrument panel harness
Details
       

 11-27-2009
3.00
1. Finishe aft top skin
Details
       

 11-26-2009
3.00
Aft top skin
Details
       

 11-25-2009
2.25
2. Started riveting aft top skin
Details
       

 11-25-2009
3.75
1. Panel switches
Details
       

 11-24-2009
1.00
3. Rivet anit-rotation tab
Details
     

 11-24-2009
1.75
2. Tail stand
Details
       

 11-24-2009
0.00
1. Propeller Delivered
Details
     

 11-23-2009
1.00
Pitch Servo wire
Details
     

 11-22-2009
3.75
2. Aft Top Skin
Details
       

 11-22-2009
2.25
1. Primed Step & Stuff
Details
       

 11-21-2009
1.75
Prepare to rivet step
Details
     

 11-21-2009
3.75
Finished up wires to tail section
Details
       

 11-20-2009
2.25
More switch layouts
Details
       

 11-11-2009
1.25
Instrument Panel Labels
Details
       

 11-10-2009
2.75
Installed Batt Bus & Stby Reg
Details
     

 11-09-2009
1.00
Fit main panel to sub-panel
Details
     

 11-01-2009
1.00
New connection between ANL and Relay
Details
     

 11-01-2009
4.25
Baggage floor extension done
Details
       

 10-31-2009
5.00
Baggage floor extension con't
Details
       

 10-30-2009
2.25
Baggage floor extension
Details
       

 10-30-2009
1.00
1. Switch labels
Details
       

 10-29-2009
1.75
Painted first coat on instrument panel
Details
       

 10-29-2009
1.50
EAA Technical Counselor Visit
Details

 10-28-2009
1.75
Installed ANL holder, cut battery bolts
Details
       

 10-26-2009
2.75
P-Mag push buttons
Details
       

 10-26-2009
0.00
Lighted Pitot Heat Toggle
Details
       

 10-25-2009
3.00
Moved ANL, set battery tray
Details
       

 10-25-2009
0.75
Finished purge return line
Details
       

 10-24-2009
4.00
Purge return line
Details
       

 10-24-2009
2.75
Ammeter shunt and ANL
Details
     

 10-23-2009
3.50
Diode to E-bus jumper
Details
       

 10-22-2009
6.00
Caution lights
Details
       

 10-21-2009
3.75
Connected big cables
Details
       

 10-20-2009
5.25
Big wire to circuit breaker
Details
       

 10-19-2009
4.25
Installed CBs and Bus bar
Details
       

 10-18-2009
5.00
CB labels done
Details
     

 10-17-2009
6.00
Made some CB Labels
Details
       

 10-16-2009
4.00
CB Labels
Details

 10-07-2009
3.00
Painted CB Panel, started Purge line
Details
     

 10-01-2009
1.25
Installed Dehydrator plugs
Details
       

 09-30-2009
2.50
Switch Template - (R) Console
Details
       

 09-30-2009
3.00
Drilled CB Holes
Details
       

 09-29-2009
9.50
Circuit breakers and doide
Details
       

 09-27-2009
1.00
Continuted purge return line
Details

 09-26-2009
1.50
Purge return line
Details

 09-25-2009
5.75
Mounted Relays
Details
       

 09-23-2009
2.75
Worked on CB Layout - Installed ELT BNC connectors
Details
     

 09-15-2009
0.25
Test fit 3rd Panel
Details
       

 08-31-2009
1.25
Test fit Panel
Details
       

 08-30-2009
2.00
More tail wires
Details
       

 08-30-2009
2.50
Drilled Fwd Top Skin
Details
       

 08-19-2009
4.75
Instument sub panels clecoed top skin
Details
       

 08-18-2009
4.00
Cut holes in panel for G-meter and air vent
Details
       

 08-17-2009
2.00
Instrument panel arrived
Details
       

 08-16-2009
5.00
Prepared to fit front top skin
Details
       

 08-12-2009
1.00
Metal Punch
Details
       

 08-12-2009
2.75
Installed OAT probe & Rear stick pin
Details
       

 08-10-2009
3.75
Lace tied aft wires
Details
       

 08-03-2009
3.00
New (R) tank fuel line
Details
       

 08-02-2009
4.50
Finished battery holder
Details
       

 08-01-2009
3.50
Fabricating battery holder
Details
       

 07-31-2009
5.75
Built ELT deck
Details
       

 07-24-2009
0.00
Panel cutting
Details
       

 07-11-2009
1.25
Static line
Details
       

 07-11-2009
5.50
Pitot connection & Securing wires
Details
       

 07-10-2009
4.25
ELT antenna & more aft wiring
Details
       

 07-09-2009
0.00
Arlington Fly-In (drive in for me)
Details
       

 07-08-2009
2.25
Removed aft battery cable
Details
     

 07-07-2009
5.00
Picked up finish kit
Details
       

 07-06-2009
0.00
Final Panel Design
Details
       

 07-05-2009
9.25
Prepared bottom skins for riveting
Details
       

 07-04-2009
2.25
Wire Pitot Heat
Details
       

 07-04-2009
1.00
Counter sink (R) wing rear spar for skin dimples
Details
     

 07-03-2009
4.50
Safety Trim system
Details
     

 07-01-2009
1.50
Engine has arrived
Details
       

 06-30-2009
5.00
Battery cable to the firewall
Details
       

 06-29-2009
3.75
Primed and riveted the "Wall of Breakers"
Details
       

 06-28-2009
2.00
Drilled for nut plates on new console assembly
Details
       

 06-27-2009
5.75
New right console with breaker panel
Details
       

 06-27-2009
1.25
More battery cable analysis
Details
     

 06-26-2009
2.00
Route battery cable to firewall NOT!
Details
       

 06-26-2009
3.25
Finished remote compass bracket
Details
     

 06-25-2009
4.50
Remote compass bracket
Details
       

 06-23-2009
3.50
Pitot mounting screws
Details
       

 06-23-2009
0.00
Engine is shipping
Details
     

 06-19-2009
0.00
Panel Plans
Details
       

 06-11-2009
0.00
Panel Design
Details
     

 06-10-2009
3.25
Dynon Pitot Controller
Details
       

 06-10-2009
0.75
Aft end of static system
Details
     

 06-09-2009
1.75
Wing Conduit/Torque tank bolts
Details
       

 06-09-2009
0.75
Installed Static Ports
Details
       

 06-08-2009
1.00
Finished Bead Blasting Pedals
Details
       

 06-08-2009
2.25
(L) wing conduit
Details
       

 06-04-2009
0.75
Bead Blast rudder pedals
Details

 06-03-2009
2.50
Riveted on Exhaust Cooling Ramp
Details
     

 06-02-2009
2.75
Static line clips
Details
       

 05-24-2009
2.25
Shim for Cooling Ramp
Details
       

 05-24-2009
0.00
Roll servo bracket
Details
       

 05-23-2009
0.00
New roll bracket
Details
       

 05-23-2009
1.50
Cooling Air Ramp
Details
     

 05-22-2009
4.50
(R) Wing conduit
Details
       

 05-21-2009
0.75
Roll servo bracket
Details
       

 05-21-2009
2.75
Right Fuel Sender and P/U
Details
     

 05-20-2009
3.00
Left fuel sender and pickup
Details
       

 05-17-2009
1.00
Left Fuel Sender
Details

 04-24-2009
2.75
Battery Tray
Details
     

 04-02-2009
2.25
"Human Factor Test" - Test fit rear throttle
Details
       

 04-01-2009
3.50
Rivet bulkhead tops
Details
       

 03-31-2009
4.50
Primed and riveted aft bulkhead parts.
Details
       

 03-28-2009
3.50
Made flap arm cover from template
Details
     

 03-27-2009
2.00
Prepare instrument panel
Details
     

 03-26-2009
4.25
Deburred aft top skin and bulkheads
Details
       

 03-24-2009
3.00
Drilled canopy bow
Details
       

 03-22-2009
6.50
Aft top skin, start canopy bow
Details
       

 03-21-2009
4.50
Clecoed on aft top skin
Details
       

 03-20-2009
6.00
Starting upper aft fuselage
Details
       

 03-19-2009
4.75
Last fuel line. Fit Step
Details
       

 03-18-2009
3.00
(R) Brake line, Fuel return line
Details
       

 03-16-2009
2.50
Left brake line though cockpit
Details
       

 03-15-2009
2.75
Fuel line between filter and pump
Details
     

 03-14-2009
2.75
More fuel lines, left and to filter
Details
       

 03-13-2009
6.00
Right fuel supply line and vent lines
Details
       

 02-26-2009
6.25
Installed Fuel Pump and (L) vent line
Details
       

 02-25-2009
4.50
Half of right vent, installed fuel filter
Details
       

 02-24-2009
4.25
Set torque on (R) mount
Details
       

 02-23-2009
1.75
Installed bolts holding (R) gear mount
Details
     

 02-22-2009
4.75
More fitting right gear weld mount
Details
       

 02-21-2009
1.25
Removed bolts to right gear weld mount
Details

 02-20-2009
3.25
Installed and set torque on (L) gear weld moun
Details
       

 02-04-2009
0.50
Installed bolts into left gear weld mount
Details

 02-03-2009
2.00
Finished (L) gear weld mount
Details
       

 02-02-2009
3.75
Gear Weld Mount Part 3
Details
       

 02-01-2009
2.50
Remove Gear Weld Mount Part 2
Details
       

 01-31-2009
0.75
Remove Gear Weld Mount Part I
Details
     

 01-30-2009
1.50
Removed left wooden spar
Details

 01-29-2009
2.00
Installed fuel and brake bulkhead fittings
Details
       

 01-28-2009
1.00
Checked torque of gear mounts
Details
     

 01-20-2009
0.75
Removed seat and floor panels
Details
     

 01-05-2009
1.00
Riveted some nut plates
Details
       

 01-05-2009
3.00
Interior Paint Complete
Details
       

 01-04-2009
7.50
Painted removable interior parts
Details
       

 01-03-2009
7.50
Painting Interior begins!
Details
       

 01-02-2009
4.50
Clean and tape cockpit for paint
Details
     

 01-01-2009
3.00
Install "eyball" lights to 804 caps
Details
       

 12-31-2008
1.75
Install nut plates for bracket
Details
     

 12-30-2008
5.00
Install Andair Fuel valve
Details
       

 12-26-2008
4.00
Rear Throttle complete
Details
       

 12-22-2008
4.75
Rear Throttle continued
Details
       

 12-19-2008
1.75
Rear throttle continued
Details

 12-18-2008
1.50
Rear Throttle rod holes
Details
       

 12-11-2008
3.25
Contined Rear Throttle, Removed Tail
Details
       

 12-09-2008
2.00
Rear Throttle kit
Details
       

 12-01-2008
1.50
Began fuel system section
Details

 11-29-2008
3.00
Adjusted fit of aft mount
Details
       

 11-28-2008
6.50
Installed flap motor, and rudder cables
Details
       

 11-27-2008
1.25
Drilled flap actuator for safety wire
Details
     

 11-25-2008
3.00
Hung the rudder and trimed the stops
Details
       

 11-24-2008
2.75
Finished trimming elevator stops
Details
       

 11-24-2008
4.25
Drilled elevator horns and connecte push rod
Details
       

 11-23-2008
2.50
Trimmed HS, Set (R) elevator travel limits
Details
       

 11-22-2008
5.75
Continued control linkages
Details
       

 11-21-2008
0.50
Began install of control column
Details
     

 11-20-2008
6.00
Finished VS install.
Details
       

 11-19-2008
6.50
Installed Vertical Stab
Details
       

 11-18-2008
3.00
Drilled attach holes for HS
Details
       

 11-17-2008
4.50
Began installing Horzontal Stab
Details
       

 10-28-2008
1.50
Pitch Servo Bracket continued.
Details
       

 10-27-2008
1.50
Servo bracket install continued
Details
       

 10-27-2008
1.50
Install pitch servo bracket
Details
       

 10-10-2008
2.00
Drill pedal extensions to pedal
Details
       

 09-29-2008
5.00
Continued brake pedal extensions
Details
       

 09-28-2008
3.00
Pedal Extensions
Details
       

 09-27-2008
2.00
Pedal release assembly
Details
       

 09-26-2008
4.25
Brake pedals and master cylinders
Details
       

 09-25-2008
1.00
Rudder pedal slide blocks
Details
       

 09-24-2008
2.50
Rudder pedal slide bar
Details
       

 09-23-2008
4.75
Replace bad F-810C angle
Details
       

 09-22-2008
0.00
Major issue with F810C-1
Details
       

 09-21-2008
5.50
Install electric aileron trim brackets and rod
Details
       

 09-20-2008
3.75
Primed out side of tubes installed stick bushings
Details
       

 09-19-2008
2.25
Prime control tubes, start aileron trim parts
Details
       

 09-18-2008
1.00
Riveted on bearing to F-841 tube
Details

 09-16-2008
5.50
Elevator bell crank and push rods
Details
       

 09-13-2008
0.00
Test ride!
Details
       

 09-12-2008
0.75
Rivet on tail tie down
Details
       

 09-11-2008
4.50
Installed (R) longeron console nuts
Details
       

 09-10-2008
1.75
Drilled F-812 angle, tapped tie down
Details
       

 09-09-2008
3.00
(L) console nut plates. F812B angle
Details
       

 09-08-2008
0.50
Drilled rivet holes for nut plates in right longer
Details
     

 08-27-2008
1.50
Tapped holes in cable anchor bracket
Details
       

 08-26-2008
3.00
Fit rear pedal idler arm. L/R upper console suppo
Details
       

 08-24-2008
4.00
Drilled left longeron for console cover
Details
       

 08-17-2008
5.00
Installed nut plates for rear rudder pedal guides
Details
       

 08-16-2008
2.00
Part 2: Rear rudder pedals
Details
       

 08-16-2008
5.50
Part 1: Rivet nut plates on to floors and consoles
Details
       

 08-15-2008
5.75
Deburr and Prime floor and console parts
Details
       

 08-14-2008
4.50
New flap blocks, front consoles
Details
       

 08-13-2008
2.50
Tail tie down and cable anchor
Details
       

 08-12-2008
5.50
Main Gear mounting Bolt Reaming
Details
       

 08-11-2008
2.25
Floor panel stiffeners and rear seat hinge
Details
       

 08-10-2008
7.50
Front seat floor stiffeners and nut plates
Details
       

 08-02-2008
1.00
Continued work on flap blocks
Details
       

 08-01-2008
1.75
Flap weld mount blocks
Details
       

 07-14-2008
0.00
Part: 2 Bulkhead bulge
Details
       

 07-14-2008
5.50
Part 1: Fiished riveting rear seatback, clecoed fl
Details
       

 07-13-2008
7.00
Finished Front Seat Back and started the rear seat
Details
       

 07-12-2008
2.25
Started front seat back
Details
       

 07-11-2008
2.00
Started work on mounting step
Details
       

 07-10-2008
5.00
Built fuselage rotisserie
Details
       

 07-07-2008
2.50
Finished up mounting (R) flap
Details
       

 07-06-2008
5.25
Started mounting of (R) flap
Details
       

 05-21-2008
0.75
Part 3: Set (R) aileron neutral position
Details
     

 05-21-2008
3.00
Part 2: Aileron stops installed, checked travel li
Details
       

 05-21-2008
2.00
Part 1: Rivet (L) flap hinge to wing
Details
       

 05-20-2008
2.75
Prep flap hinge, install (R) aileron bell crank
Details
       

 05-19-2008
3.25
Drilled (L) flap hinge to wing and brace
Details
       

 05-18-2008
3.50
Rivet (R) gap seal, make aileron bushings
Details
       

 05-16-2008
2.50
Aileron rigging jig, aileron bushings
Details
       

 05-11-2008
5.25
Rolled and riveted elevator leading edges
Details
       

 05-08-2008
0.50
Riveted on nutplates to pitot mast
Details
       

 05-07-2008
1.00
Primed push rods and pitot mast parts
Details
       

 05-06-2008
2.25
TIG Welded the W-818 push rods
Details
       

 05-02-2008
1.00
Deburr pitot mount, cut tube on the pitot
Details
       

 04-30-2008
1.50
EAA Technical Counselor Visit
Details
       

 04-30-2008
4.50
Drilled Pitot mount and cut bottom skin to fit
Details
       

 04-27-2008
0.50
Clecoed on (R) bottom skin
Details
     

 04-26-2008
4.50
Reamed brass bushings, drill left bottom skin
Details
       

 04-24-2008
0.50
Rivet left gap seal top skin rivets
Details
       

 04-23-2008
2.25
Rolled and riveted rudder leading edge
Details
       

 04-22-2008
4.50
Rivet W-816 Push rods, rivet on gap seals
Details
       

 04-22-2008
0.00
Explaination and pictures of push rods
Details
       

 04-21-2008
4.25
Primed and riveted flap brace and gap seal
Details
       

 04-19-2008
5.25
Drilled holes in W-816 push rods
Details
       

 04-17-2008
4.00
Marked holes to push rod end, drilled gap and flap
Details
       

 04-16-2008
1.25
Cut brass bushing and cut large push rods
Details
     

 04-15-2008
3.00
Cut small aileron push rods and aluminum bushings
Details
       

 04-14-2008
2.25
Attached bracket onto left aileron
Details
       

 04-13-2008
3.00
Riveted right W412/414, drilled aileron for bracke
Details
       

 04-12-2008
0.00
Flew to SnF
Details
       

 04-04-2008
2.00
Cleco right wing bottom skin
Details
     

 04-01-2008
1.50
Drilled out cracked rivet
Details

 03-31-2008
1.00
Drilled out bad rivet and reset
Details
       

 03-30-2008
2.00
Riveted on left mid spar aileron bracket
Details
       

 03-29-2008
1.75
Tried to fit bottom skin!
Details
       

 03-29-2008
6.25
Primed and then riveted aileron bracket
Details
       

 03-28-2008
2.00
Smothed edges of aileron braket parts
Details

 03-27-2008
1.00
Start Wings
Details
       

 03-26-2008
0.00
Hardware organization
Details
       

 03-23-2008
4.25
Trim Tab riveted inplace
Details
       

 03-22-2008
2.25
Riveted bottom of trim tab
Details
       

 03-19-2008
1.75
Finished riveting elevator up to trim tab holes
Details
       

 03-18-2008
1.25
Re-worked counterweight with wrong holes
Details
       

 03-18-2008
3.00
Placed RTV and started riveting left elevator
Details
       

 03-17-2008
3.00
Rivet left elevator understructure
Details
       

 03-16-2008
3.75
Trim tab
Details
       

 03-16-2008
0.00
Cherry Max and Van's MK319BS
Details
       

 03-15-2008
5.25
Cut off elevator tabs and built "riblet"
Details
       

 03-14-2008
3.50
Bent ends of the trim tab
Details
       

 03-11-2008
1.75
Bent trim tab trailing edge
Details
     

 03-07-2008
2.25
Prepared new E-606 trim spar
Details
       

 03-06-2008
6.50
Riveted right elevator to understructure
Details
       

 03-06-2008
0.00
Hard to reach end rivets
Details
       

 03-06-2008
0.00
Getting RTV into tight places
Details
       

 03-05-2008
2.50
Prime Elevator parts
Details
       

 03-04-2008
0.75
Front seatback
Details
       

 03-03-2008
0.00
Dimple narrow part of ribs
Details
       

 02-29-2008
2.50
Countersink 702 and 606 spars, scuff trim tab part
Details
       

 02-27-2008
2.75
Deburr right elevator spar and ribs
Details

 02-26-2008
5.00
Drilled left elevator ribs, dimpled right elevator
Details
       

 02-23-2008
3.25
Flute new ribs and drilled counter weight
Details
     

 02-18-2008
5.50
Drilled holes in left counter weight, sort of
Details
       

 02-17-2008
4.50
Drilled CS holes in spar for 709 rib
Details

 02-16-2008
2.75
Riveted on nut plates and left elevator stiffeners
Details
       

 02-16-2008
4.75
Began right elevator construction - all matched dr
Details
       

 02-15-2008
3.25
Left elevator stiffeners, E-615 plate nuts
Details
       

 02-14-2008
4.50
Riveted on right elevator stiffeners
Details
       

 02-13-2008
2.00
Began right elevator
Details

 02-12-2008
2.50
Rinished riveting the rudder
Details
       

 02-11-2008
8.25
Finished rudder structure, began rudder skin rivet
Details
       

 02-10-2008
8.00
Primed elevator and rudder parts, Rivet rudder fra
Details
       

 02-08-2008
1.25
Gathered elevator parts
Details
     

 02-06-2008
3.25
Deburr and dimle rudder parts
Details
       

 02-05-2008
2.25
Drilled out remining holes of skin to frame
Details

 02-04-2008
2.00
Primed rermainder of rudder skin
Details
       

 02-04-2008
0.00
Cleocoed on skin to structure, to evaluate bend
Details
       

 02-03-2008
4.75
Prmed stiffeners / Riveted on stiffeners
Details
       

 02-02-2008
5.75
Fabricated rudder stiffeners a 2nd time
Details
       

 01-20-2008
1.00
Getting help with back riveting
Details

 01-16-2008
2.00
Tried to figure out what I am doing wrong!
Details

 01-15-2008
10.50
Dimple, prime, rivet rudder stiffener and skin
Details
       

 01-06-2008
4.00
2. Elevator stiffener fabrication
Details
       

 01-06-2008
2.00
1. Final drilled 802 Rudder Spar, reserached nut p
Details
     

 01-05-2008
4.00
Lower Rudder structure/upper rudder rib
Details
       

 01-04-2008
2.75
Rudder rear spar, R-710 brace
Details
       

 01-04-2008
4.00
Back rivet board and control surface bender.
Details
       

 01-02-2008
2.50
Fabricate rudder stiffeners
Details
     

 12-30-2007
7.00
HS is done:)
Details
       

 12-29-2007
8.00
Riveted interior rivets on HS
Details
       

 12-28-2007
5.00
Finsihed rear spar and riveted front spar
Details
       

 12-27-2007
3.50
Primed RT skin and riveted bars onto rear spar
Details
     

 12-27-2007
3.00
Cut out lower HS rear spar for elevator
Details
       

 12-13-2007
1.00
Notch in bottom of HS Spar
Details

 12-11-2007
4.00
Primed L/R HS ribs, spars and Lt skin
Details
       

 12-10-2007
1.50
Dimpled right and left HS ribs and spars
Details
     

 12-06-2007
4.50
Smoothed Lt HS skin, Dimpled Rt HS skin
Details
       

 12-03-2007
1.00
Deburred Rt HS parts
Details

 11-23-2007
3.25
Dirlled critical hole is Right side 405, and skin
Details
       

 11-22-2007
3.25
Prepared right HS ribs and drilled attach holes
Details

 11-22-2007
0.00
HS 814 reinforcing angle clearance
Details
       

 11-22-2007
4.50
Drilled 404/405 rib holes and all skin to frame
Details
       

 11-19-2007
4.25
Drilled Left HS ribs to spar, marked and fluted
Details
       

 11-18-2007
2.00
Marking holes for 405 forward flange
Details
       

 11-17-2007
3.00
HS Fwd spar reinforcing angle bends
Details
       

 11-17-2007
4.00
Front Spar: Reinforcing angle prep
Details
       

 11-17-2007
3.00
Fluting HS ribs
Details

 11-15-2007
0.75
Riveted VA-146 Bearing.
Details
       

 11-14-2007
1.00
VS Complete!
Details
       

 11-13-2007
7.00
Riveted remaining skin rivets
Details
       

 11-12-2007
3.50
Rivet VS skin to structure
Details
       

 11-12-2007
4.00
Rear Spar Assembly
Details
     

 11-11-2007
1.50
Primed the VS
Details
       

 11-10-2007
1.00
Deburred edges of VS
Details
     

 11-09-2007
4.00
Finished Paint booth, reset 2 rivets
Details
       

 11-08-2007
5.75
Started to build paint booth
Details
       

 11-06-2007
1.50
Finished dimpling of the VS skin
Details

 11-05-2007
0.00
First item of panel arrived today
Details
     

 11-05-2007
1.00
Finished deburring the skin and started dimples
Details

 11-04-2007
2.50
Built table for DRDT-2 / deburr VS
Details
     

 10-26-2007
3.50
Primed and riveted VS ribs
Details
       

 10-25-2007
5.75
Primed and riveted VS spar and doubler
Details
       

 10-24-2007
2.75
Deburr VS main spar and doubler
Details
     

 10-18-2007
5.00
Fluiting the Ribs / Matched drill VS
Details
       

 10-17-2007
3.00
Fluting VS rib (NOT!)
Details

 10-16-2007
0.75
Vertical Stab Main spar preperation
Details
     

 10-15-2007
1.50
Van's Toolbox Hinge
Details

 10-15-2007
1.50
Riveted on hinge to toolbox
Details
       

 09-27-2007
2.00
Riveted side of Van's toobox
Details
     

 09-26-2007
0.00
Damaged Drawings
Details
       

 09-24-2007
6.75
Built Rack for Wings
Details
       

 09-18-2007
1.50
Training Project
Details

 09-10-2007
0.00
Answers from Van's
Details
       

 09-08-2007
0.00
Possible Damage?
Details
       

 09-08-2007
9.00
Inventory of Second QB kit
Details
       

 09-07-2007
9.00
Return QB Kit #1
Details
       

 08-29-2007
6.00
Inventory of QB Kit
Details

 08-28-2007
0.00
Picked up QB kit
Details
       

 08-20-2007
0.00
QB kit is ready for pick up
Details

 08-14-2007
2.00
Practice Project
Details
       

 08-10-2007
0.00
My RV Factory
Details
       

 08-08-2007
2.00
Inventory of Empanage
Details
     

 07-30-2007
4.50
Reviewed Plans HS
Details

 07-28-2007
0.00
Fundamental class Synergy Inc.
Details
       

 07-27-2007
0.00
Picked Up Tail Kit
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.