Work Logs Found: 129
Category Work Time: 414 Hours
 Date
Hours
Work Log Summary

Details

 03-07-2012
2.25
Wired F804 Cap lights
Details

 03-04-2012
2.25
Re-installed CB and Inst Panels
Details
     

 03-03-2012
1.50
Battery hold down strap
Details
       

 02-08-2012
0.75
Part 2 Wrapped some wire bundles
Details
       

 02-07-2012
1.25
Part 2 Wire bundle tying
Details

 02-02-2012
1.75
2. More wire tying
Details
       

 02-01-2012
1.50
1. Secured rear stick cable
Details
       

 07-16-2011
3.75
1. Fwd Baggage conduit
Details
       

 04-22-2011
4.00
Installed shunt and ANL
Details
     

 04-18-2011
1.00
Lace tied wires
Details
       

 04-14-2011
1.75
Hooked up fuel boost pump wires
Details
     

 03-27-2011
1.00
Part 2: Front power outlet
Details
       

 03-19-2011
4.50
E-bus feed diode and relay
Details
       

 03-18-2011
3.00
Hot Battery Bus items
Details
       

 01-09-2011
4.00
Start Arm decal and tested circuits
Details
       

 01-08-2011
2.50
Terminated more CB wires
Details
     

 01-07-2011
3.00
Terminated CB wires
Details
     

 01-05-2011
3.00
Organized wires behind CB panel
Details
       

 01-04-2011
4.25
Completed (R) console connections
Details
       

 01-02-2011
5.50
Molex connection to right console
Details
       

 01-01-2011
1.75
Front LED side lights
Details

 12-31-2010
2.25
Soldered wire to LED lights
Details
       

 12-30-2010
2.50
Pulled wires for Alt Field and IGN
Details
       

 12-29-2010
1.25
Finished label plate
Details
     

 12-28-2010
3.25
Re-painted CB panel
Details
       

 12-27-2010
2.50
Made Bracket for standoffs
Details
     

 12-22-2010
3.75
CB panel fit
Details
       

 12-19-2010
6.25
Right Console Molex connnections
Details
     

 12-18-2010
5.50
Re-layed out CBs
Details
       

 12-17-2010
3.25
Continued to wire (R) Console
Details
       

 12-16-2010
1.50
Molex connection on (R) console
Details

 12-15-2010
2.75
Connected Main Bus Feed
Details
     

 12-14-2010
1.50
Part 2: Wire organization
Details
       

 12-13-2010
4.50
Spliced NAV/STRB, LAND and TAXI wires
Details
       

 12-12-2010
6.75
Hooked up remianing wires under seat
Details
       

 12-11-2010
2.50
Solder wires to switch
Details
       

 12-06-2010
4.25
Installed standoff
Details
       

 12-05-2010
1.75
Made stand off
Details
     

 12-04-2010
3.00
Tested Aileron Trim
Details
     

 11-30-2010
3.00
Tested Smart Start
Details
     

 11-29-2010
1.25
Drilled battery tray to floor
Details
     

 11-28-2010
6.25
WIre supports for E&E bay
Details
       

 11-27-2010
5.25
E&E Bay wires
Details
       

 11-26-2010
5.00
Connected Aileron Trim
Details
       

 11-24-2010
1.25
Installed Smart Start Arm button
Details
     

 11-22-2010
4.25
Wired sticks to terminal and tested
Details
       

 11-21-2010
3.50
Stick wire arrangement
Details
     

 11-20-2010
4.00
Wired servos to terminal
Details
       

 11-18-2010
4.50
Terminal for A/P servo wires
Details

 11-17-2010
3.00
Secured stick wires
Details
       

 11-15-2010
5.00
Terminal/relay tray under front seat
Details
       

 11-14-2010
7.25
Rear stick connector
Details
       

 11-11-2010
1.00
Rear stick connector
Details
       

 10-29-2010
1.25
Pitch servo wires
Details
       

 10-28-2010
4.00
Pitch Servo
Details
       

 10-27-2010
2.75
Made support for rear of radio stack
Details
       

 10-26-2010
1.75
Panel fitting
Details
       

 10-12-2010
2.25
Strobe sync wire
Details
     

 10-08-2010
3.50
EMS harness fit and wire organization
Details
       

 10-07-2010
2.50
Rear power outlet and seat heat
Details

 10-06-2010
3.00
Left wire bundle Pitot AOA line route
Details

 09-30-2010
2.50
Front cockpit LED lights
Details

 07-15-2010
2.25
Riveted on Map light mount
Details
       

 07-13-2010
1.25
Painted mount for Map Light
Details
     

 07-12-2010
3.25
Part II - Map light mount
Details
     

 07-02-2010
4.50
RCP LED ligths
Details
       

 07-01-2010
4.00
Light in the rear baggage area
Details
       

 06-29-2010
0.50
Installed LED stirps
Details
       

 06-28-2010
3.75
Part II - Rear cockpit lighting
Details
       

 05-30-2010
1.25
Cockpit lighting and Trim
Details
     

 05-28-2010
3.50
Heated seat wires
Details
       

 05-27-2010
1.50
Flap motor wire
Details
       

 05-26-2010
5.00
Part 1-Connectors on antenna cables & A/P wires
Details
       

 05-25-2010
0.75
Test fit new Dynon 10A EFIS
Details
       

 05-24-2010
3.25
Left side wire bundle
Details
       

 05-23-2010
4.00
More wire work!!!
Details
       

 05-22-2010
7.25
Electrical - More wires, and redos
Details
       

 05-21-2010
1.50
More Left side wire bundle
Details
       

 05-20-2010
4.50
Left side wire bundle standoff
Details
     

 04-27-2010
3.25
1. Wire route for instrument panel harness
Details
     

 04-20-2010
1.25
Made bezel to hold ELT Control
Details
       

 04-07-2010
3.50
Electical wires continued
Details
       

 04-01-2010
4.00
Tested LED strip lights
Details
       

 03-31-2010
2.25
Wired CBs to Molex
Details
       

 03-31-2010
3.50
Touched up CB panel chips
Details
       

 03-30-2010
4.50
New wires to console swtiches
Details
       

 03-29-2010
3.25
Made bracket to hold Molex connector
Details
       

 03-28-2010
3.00
Wired console switches to CBs
Details
     

 03-27-2010
6.00
(R) console labels
Details
       

 03-26-2010
5.00
(R) Console Switches
Details
       

 03-25-2010
5.75
Wired Batt to Master Switch
Details
       

 03-23-2010
3.00
Installed firewall pass thru
Details
       

 11-30-2009
1.75
2. Safety Trim module
Details
       

 11-28-2009
2.00
More wiring ideas
Details
       

 11-27-2009
2.00
2. Instrument panel harness
Details
       

 11-25-2009
3.75
1. Panel switches
Details
       

 11-23-2009
1.00
Pitch Servo wire
Details
     

 11-21-2009
3.75
Finished up wires to tail section
Details
       

 11-20-2009
2.25
More switch layouts
Details
       

 11-10-2009
2.75
Installed Batt Bus & Stby Reg
Details
     

 11-01-2009
1.00
New connection between ANL and Relay
Details
     

 10-29-2009
1.75
Painted first coat on instrument panel
Details
       

 10-28-2009
1.75
Installed ANL holder, cut battery bolts
Details
       

 10-26-2009
2.75
P-Mag push buttons
Details
       

 10-26-2009
0.00
Lighted Pitot Heat Toggle
Details
       

 10-25-2009
3.00
Moved ANL, set battery tray
Details
       

 10-24-2009
2.75
Ammeter shunt and ANL
Details
     

 10-23-2009
3.50
Diode to E-bus jumper
Details
       

 10-22-2009
6.00
Caution lights
Details
       

 10-21-2009
3.75
Connected big cables
Details
       

 10-20-2009
5.25
Big wire to circuit breaker
Details
       

 10-19-2009
4.25
Installed CBs and Bus bar
Details
       

 10-18-2009
5.00
CB labels done
Details
     

 10-17-2009
6.00
Made some CB Labels
Details
       

 10-16-2009
4.00
CB Labels
Details

 09-30-2009
2.50
Switch Template - (R) Console
Details
       

 09-30-2009
3.00
Drilled CB Holes
Details
       

 09-29-2009
9.50
Circuit breakers and doide
Details
       

 09-25-2009
5.75
Mounted Relays
Details
       

 09-23-2009
2.75
Worked on CB Layout - Installed ELT BNC connectors
Details
     

 08-30-2009
2.00
More tail wires
Details
       

 07-11-2009
5.50
Pitot connection & Securing wires
Details
       

 07-10-2009
4.25
ELT antenna & more aft wiring
Details
       

 07-08-2009
2.25
Removed aft battery cable
Details
     

 07-04-2009
2.25
Wire Pitot Heat
Details
       

 07-03-2009
4.50
Safety Trim system
Details
     

 06-30-2009
5.00
Battery cable to the firewall
Details
       

 06-27-2009
1.25
More battery cable analysis
Details
     

 06-26-2009
2.00
Route battery cable to firewall NOT!
Details
       