Date:  2-27-2011
Number of Hours:  4.75
Manual Reference:  
Brief Description:  More wires and CBs

I know I can’t rush things but I am really tired of the electrical/avionics stuff. It is love hate, I like working on it but I want it done. Today I lace tied the AP-74 wires and worked them into the main harness and I also installed BNC connectors for all the antennas but the G/S and GPS.

Before I installed the main panel I had to pull wires for the warning lights, two will need a power source; they are the Master Warning and the Standby Alternator lights. I then connected these wires to their circuit breakers along with the D180 and D10A.

It was then time to test fit the panel. I am getting closer but I will have to run the main harness below instead of in front of the main cross beam, it just interferes with the bottom unit in the radio stack. I was hoping to have the electrical done by the end of the month, looks like I will miss that but not by much.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.