KitLog pro

Powered By Kitlog Pro v2.0

RVGator
' style=
Date:  2-11-2011
Number of Hours:  4.75
Manual Reference:  
Brief Description:  Tied wire bundle

I organized the wires to the right side switches and began to lace tie them up. The only wires I still need to worry about are the ones that pass through the panel to the map light, side eyeball lights and the instrument panel LED stip. I had a hole under the longeron in the panel for the map and side eyeball lights but I needed to decide how to get the instrument LED light wires to the back of the panel. After some thought I decided on a small hole with a grommet right where the strip of LEDs ends.

I bought some hardware to secure the 25 pin connector I am using for my DSAB Hub. After securing that in place I began to lace tie the right side switch wires. I then tested the switch functions and continuity to the wires forward of the firewall and all worked perfect!
' style=





' style=

DSAB Hub on top, instrument ground bus on the bottom.  These will get a connector shell.

DSAB Hub on top, instrument ground bus on the bottom. These will get a connector shell.

' style=

Pass through hole for the instrument LED strip

Pass through hole for the instrument LED strip

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.