KitLog pro

Powered By Kitlog Pro v2.0

RVGator
' style=
Date:  8-6-2012
Number of Hours:  7.75
Manual Reference:  
Brief Description:  Aileron push rods and front floor

I was kind of all over the place today. I worked some on the elevator and vertical stab fiberglass tips. I need to get these done so I can rig the tail. It takes time for the epoxy to set so I do a little of this work first thing in the shop each day or I try to. I tightened up the brake line going through the floor first making sure the fitting was clocked for the line that runs down the gear leg to the brake.

I tied the remaining wires is the floor then ran the Pitot and AOA lines forward of the wing spar. I set the torque on the tan support brackets and the fuel vent lines.

I hooked up the aileron push rods to the control column, they were removed to make the wing install a little easier and I needed them out of the way to tie up the last of the wires under the floor. I got the right console back in and the circuit breaker panel re-hinged but called it a day before I could do more.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.