Back to my full time job of building an airplane after a nice 3 day trip with Delta. I confirmed the plane was still level and plumb in the pitch and roll axis. I then installed the horizontal stabilizer. This was a fairly tough task since there is not room for big hands in this area. This would have been better as a two person task but no one was around the airport today.
My part came in from Van’s so I set the last 6 rivets into the cockpit floor. I still have the aft baggage area to do but that can wait until later.