Today was more work on the trim servo wires. I bought the hardware to mount the terminal block that will tie the two trim servos to the trim system. I did some of the work on the bench; I put the ferrules on the end of the wires and tied the harness together.
Before I could do more work in the E&E bay I had to make sure the battery position would be fine. I needed the positive cable to be elevated so I installed a pretty heavy battery post. I originally was not going to use this post, most just use the 6mm screw. The top of the batty post used a 3/8 in bolt so I had to put a new lug on the end of the battery cable. The fit is good so I can now move on.