KitLog pro

Powered By Kitlog Pro v2.0

RVGator
' style=
Date:  4-27-2010
Number of Hours:  3.25
Manual Reference:  
Brief Description:  1. Wire route for instrument panel harness

A good portion of my time today did not result in tangible results. I spent a lot of time with the instrument panel installed and worked on where I want to run the wires for the instrument panel harness. This took some time as I am trying to think about future maintenance and modifications. I want to be able to remove the panel without disturbing the other wiring.
' style=

Only thing to take a picture of is hole for wires in left bulkhead.

Only thing to take a picture of is hole for wires in left bulkhead.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.