KitLog pro

Powered By Kitlog Pro v2.0

RVGator
' style=
Date:  3-31-2010
Number of Hours:  2.25
Manual Reference:  
Brief Description:  Wired CBs to Molex

Cut the wires to female side of the Molex connector and installed pins. Test fit for fuselage clearance, I used my snake camera to see how much clearance I will have from the side of the fuselage. In the photo you can see the 3/16” wooden dowel; I can move this with no contact between it and the CB panel parts. I will put some plastic protection tape on the fuselage for added protection but I think that will be overkill. Next I checked the continuity of each wire between the switch connection and the CB, no crossed wires!
' style=

Not in picture but zip ties get replaced with lacing cord

Not in picture but zip ties get replaced with lacing cord

' style=

Shot of camera video screen, dowel is near main power connection lug which sticks out the farthest.

Shot of camera video screen, dowel is near main power connection lug which sticks out the farthest.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.