KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  7-31-2010
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Cowling #6

-Hinge work today
Deburred, drilled and countersunk literally hundreds of holes in the hinges. Also fabricated the top cowl firewall hinge retainer and made the decision to use screws on the short 6" bottom hinges (no way to get a pin out around my exhaust). The side retainers are mostly figured out, but I still need to create the hardware.

More to come.
' style=

Hinge retailer for the left and right upper firewall hinges (can be accessed from the oil door)

Hinge retailer for the left and right upper firewall hinges (can be accessed from the oil door)

' style=

The little holes are for -3 rivets and the big ones are for bonding the hinge to fiberglass)

The little holes are for -3 rivets and the big ones are for bonding the hinge to fiberglass)

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.