KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  1-30-2009
Number of Hours:  1.10
Manual Reference:  8-56
Brief Description:  Control System Installation #4

-Cleco'd the elevator bell crank together (I primed it last night real quick).
-Riveted the same
-Layed out the 8 holes in each end of the elevator pushrod per the plans
-Drilled and cleco'd the holes as I went - no issues to report, worked great!
' style=

Bellcrank cleco'd then riveted

Bellcrank cleco'd then riveted

' style=

All done.

All done.

' style=

Pushrod drilled and ready to deburr and prime

Pushrod drilled and ready to deburr and prime

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.