KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  1-29-2009
Number of Hours:  1.10
Manual Reference:  8-55
Brief Description:  Control System Installation #3

-Cut the 3 brackets that make up the bell crank out with bandsaw and then deburred the edges with the 3M wheel. Next I cleco'd the pieces together with the bearing and match drilled to #30. Then I disassembled, deburred, and scuffed those parts to be primed.

-Next I measured out the pushrod and cut it to length. Outta time - gotta go to work!
' style=

Individual pieces for the elevator bell crank

Individual pieces for the elevator bell crank

' style=

Here's what the plans say about the bellcrank

Here's what the plans say about the bellcrank

' style=

Elevator push rod tube cutting

Elevator push rod tube cutting

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.