KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  12-12-2008
Number of Hours:  1.60
Manual Reference:  8-47
Brief Description:  Seat Floors #1

Started on the floor boards this morning.
-Trimmed the upper corners of the Footwell.
-Deburred the left and rigth floorboards, the footwell, and the fwd floorboard.
-Separated and edge deburred the F805F-1 spacers (2)
-Cleco'd the right floorboard and spacers into place
-Cleco'd the left floorboard into place
-Cleco'd the aft baggage comparment floor and shelf into place
-Final drilled #30 the aft baggage floor to left and right floorboards to F807 bulkhead holes
-Final drilled #30 the remaining aft baggage floor and shelf holes
' style=

Right floorboad

Right floorboad

' style=

Left and right floorboard in place.

Left and right floorboard in place.

' style=

Now with the aft baggage floor and shelf in place.

Now with the aft baggage floor and shelf in place.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.