Brief Description: Brackets for Horizontal Stabilizer/Front Spar
Got alot accomplished this morning, match drilled the elevator brackets to the rear spar and assembled HS411 which involved my first riveting! They are decent and certainly up to specs. I just have to learn to hold the squeezer very straight and clamp down the work before trying to rivet. I also match drilled HS411 for its attach bolts and marked all the HS parts for dissambly and prep for assembly later. I started on the front spar and match drilled the top and bottom attach brackets. I can't wait to get back out there, which is a good sign! I hope I am saying that this time next year and hopefully I'm not still working on the empennage!