Powered By Kitlog Pro v2.0
Brent s RV-8 Project N784DE
RV-8
All
10-6-2006
< Previous Log Entry
Next Log Entry >
Date:
10-6-2006
Number of Hours:
1.50
Manual Reference:
6-1
Brief Description:
Started work on the rear spar
Up at 5am again and finished sanding the Horizontal Stabilizer (HS) reinforcement bars (609PP) and match drilled them to the rear spar channel(603PP) - fun! Had to cut some small blocks of wood to raise the rear spar off the tabel for drilling.
sanding the rear spar reinforcement bars
Cleco'ing the rear spar reinforcements in place
Drilling the rear spar reinforcements
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1571
2427
About me
1
Avionics
1
2
BENCHMARKS
26
25
Elevators
38
51
Empennage
13
15
Engine
2
4
Finishing
352
646
Firewall Forward
131
219
Fuselage
431
586
Hints and Tips
1
Horizontal Stab
37
50
Inspiration
1
Instrument Panel
1
Miscellaneous
13
2
Paint
22
69
polishing
40
101
post construction mx
1
PROGRESS CHARTS
2
Rudder
16
24
Shop
1
Shop Supplies
1
Tools
7
Vertical Stabilizer
9
15
What is an RV8
1
Wings
315
407
Wiring
108
211
Copyright © 2001-2024 Matronics. All Rights Reserved.