Powered By Kitlog Pro v2.0
Neils Web Site
RV9A
Finish
3-17-2014
< Previous Log Entry
Next Log Entry >
Date:
3-17-2014
Number of Hours:
4.00
Manual Reference:
8
Brief Description:
Continue Fitting Roll Bar
Continue Fitting Roll Bar
Drill aft bold holes.
Bolt Roll bar to Fuselage.
This required notching bottom flange of aft Canopy deck to allow access to tighten bolts
Not fully tightened as want to trim roll bar base overhang (as allowed by plans). See image 2
Due to tight space and spacers and bolts being upside down this required a bit of contortion to install
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
EX-3 Home
RV9A Home
Category
# Logs
# Hours
All
853
3363
Avionics
106
456
DAR and Technical Co
6
12
Delivery & Invenory
3
23
Empennage
121
306
Engine
22
82
Finish
186
765
Firewall Forward
139
509
Fuselage
178
700
Miscellaneous
3
10
None
2
40
Wings
87
460
Copyright © 2001-2024 Matronics. All Rights Reserved.