KitLog pro

Powered By Kitlog Pro v2.0

Neils Web Site
Work Logs Found: 186
Category Work Time: 570 Hours
 Date
Hours
Work Log Summary

Details

 02-21-2019
3.00
Install Co Pilot Control Grip
Details
     

 02-21-2019
3.00
Install Co Pilot Control Grip
Details
     

 02-15-2019
1.50
Warning Placards
Details
       

 02-14-2019
2.00
Install Sealt belts and Temporary Seats
Details
     

 02-13-2019
4.00
Replace Temporary Cowel pins
Details
     

 11-14-2018
2.00
Install fairig between fusalage and empennage
Details
     

 10-18-2018
3.00
Fabricate Fuel valve indicator plate
Details
     

 09-21-2018
12.00
Completed finishing of windscreen fairing
Details
     

 08-27-2018
5.00
Split canopy and windscreen
Details

 08-16-2018
3.00
Add 3 inch strip of fiberglass to base of windscre
Details
       

 08-15-2018
2.00
Add 2 inch strip of fiberglass to base of windscre
Details

 08-14-2018
2.00
Add 1 inch strip of fiberglass at base of windscre
Details

 08-13-2018
2.00
Add 1/2 strip of fiberglass at base of windcreen
Details

 08-12-2018
2.00
Fill gap beween windscreen and fusalage
Details

 08-10-2018
3.00
Layout and mask windscreen fiberglass
Details
       

 08-09-2018
5.00
Complete installation of windscreen
Details
       

 08-08-2018
3.00
Start installing windscreen
Details
     

 07-13-2018
2.50
Complete Vents
Details
     

 07-11-2018
2.00
Apply filler between windscreen and fusalage
Details

 04-28-2018
4.00
Finish triming and install right wingtip lense
Details
     

 04-27-2018
4.00
Start triming right wingtip lens
Details

 04-24-2018
3.00
Install right Strobe / Nav lights into wingtip
Details
     

 02-16-2018
5.00
Mount and wire rudder strobe
Details
       

 12-19-2017
3.00
Drill and rivet nut plates for lower rudder cap
Details
     

 12-18-2017
4.00
Bond and Fill Right Wingtip Insert
Details
     

 12-12-2017
3.00
Cut and fit instert into right Wing Tip
Details
     

 12-11-2017
3.00
Install Left Wingtip and test Lighting
Details
       

 12-06-2017
3.00
Terminate wiring left on wingtip and wing
Details
       

 12-05-2017
4.00
Complete fit of left wingtip lens
Details
     

 12-04-2017
3.00
Initial cut of left wingtip lens
Details
     

 03-24-2017
4.00
Repair Panel mounting brackets
Details
     

 01-27-2017
2.00
Remounteed prop
Details
       

 01-26-2017
3.00
Test clearances from spinner and gap fillers
Details

 01-25-2017
4.00
Fabricate Prop gap filer (other side)
Details
     

 01-23-2017
5.00
Fabricate Prop gap filer (one side)
Details
       

 01-19-2017
3.00
Remove rear spinner plate and install platenuts
Details
       

 01-18-2017
4.00
Remove prop and install platenuts in front plate
Details
     

 01-17-2017
4.00
Drill spinner to front and rear mount plates
Details
       

 01-16-2017
5.00
Remount prop and true spinner
Details
     

 01-13-2017
4.00
Cut Spinner for prop blade access
Details
       

 01-12-2017
4.00
Remove Prop and make template for spinner
Details
       

 01-11-2017
4.00
Install oil access door
Details
       

 01-10-2017
4.00
Fabricate door and hinge for oil access
Details

 12-21-2016
4.00
Complete left wheel pant
Details
       

 12-19-2016
3.00
Additonal trim of left wheel pant
Details
     

 12-15-2016
4.00
Reinforce and rivet left outer wheel pant bracket
Details
     

 12-12-2016
3.00
Initial trim of left main wheel pant
Details
     

 12-06-2016
2.00
Final fit of fairing btw front gear and Cowl
Details
     

 12-03-2016
3.00
Initial fit of fairing btw front gear and Cowl
Details
     

 12-03-2016
2.00
Final fit of Right Wheel pant and intersection fai
Details
     

 12-02-2016
3.00
Initial fit of Right Wheel Pant fairing
Details
     

 11-28-2016
5.00
Fit and drill Right wheel pant
Details
     

 11-16-2016
4.00
Align Right wheel pant with fusalage center line
Details
       

 11-15-2016
2.00
Addl trim of Right Wheel pant to fit around axel
Details
     

 11-07-2016
3.00
Refit front gear fairing with hinge
Details
     

 11-04-2016
5.00
Fabricate and and install hinge on front gear fair
Details
     

 10-31-2016
3.00
Initial trim and fint of front gear fairing
Details
     

 10-27-2016
3.00
Continue to trim and fit front wheel pant
Details
     

 10-20-2016
5.00
Initial fit of Right Wheel Pant
Details
     

 10-17-2016
7.00
Fit nose gear wheel pant to front gear
Details
       

 10-07-2016
3.00
Start fitting nose wheel pant
Details

 10-06-2016
2.00
Fit and attach right intersection fairing
Details
     

 10-05-2016
2.50
Fit and attach left intersection fairing
Details
     

 10-03-2016
2.00
Fixed leak in break lines
Details

 09-30-2016
3.00
Filled and bleed break lines
Details

 03-07-2016
3.00
Riveted hinges to cowl
Details
     

 12-17-2015
5.00
Refit top cowl to fusalage and botton cowl
Details

 12-16-2015
3.00
Bond top fusalage hinges to top cowl with flox
Details

 12-07-2015
3.00
Fit hinges to right and left sides
Details
       

 06-13-2015
0.50
On the gears
Details
     

 06-08-2015
1.50
Nose Faring support brackets
Details

 06-05-2015
2.00
Ordered Engine and Prop
Details

 06-03-2015
1.50
Set Breakout force for nose wheel
Details
     

 06-03-2015
1.50
Nose wheel fairing bracket
Details
     

 06-02-2015
1.00
Mount front gear tire to wheel
Details
     

 06-02-2015
2.50
Mount Front Gear Fork on front gear
Details
     

 05-18-2015
1.50
Mount and Safety wire outer wheel pant brackets
Details
     

 05-18-2015
0.50
Cut vertical wheel pant spacing blocks
Details
     

 05-13-2015
2.00
Install plate nuts on wheel pants
Details
     

 05-12-2015
2.00
Sand wheel pants seams smooth
Details
     

 05-11-2015
2.00
Sand epoxy fiberglass and fill divits
Details
     

 05-08-2015
1.50
Add epoxy coated fiberglass to even seams
Details
     

 05-07-2015
3.00
Temporarily fit wheel pants together
Details
       

 05-06-2015
3.00
Straighten Seams of mail wheel pants
Details
     

 05-05-2015
3.00
Install rubber wing faiing gap filler
Details
       

 05-04-2015
4.00
Final fit of left wing root fairing
Details
     

 05-01-2015
4.00
Fit and trim left wing Fairing
Details

 04-30-2015
4.00
Install platenuts under left wing and fuel tank f
Details

 04-29-2015
2.00
Final fit Right wing root fairing
Details
     

 04-27-2015
4.00
Fit and trim right wing Fairing
Details
       

 04-10-2015
2.00
Complete installation of Left main Fairing
Details
     

 04-09-2015
2.00
Center left Fairing with extended line of fusalage
Details

 04-08-2015
3.00
Layout cut and Rivet left Main Gear Fairing hinge
Details

 04-07-2015
3.00
Layout and cut left gear fairing
Details

 04-06-2015
2.00
Complete installation of Right Fairing
Details
     

 04-03-2015
2.00
Reinforce and Faring Fingers
Details
     

 04-03-2015
2.00
Center Fairing with extended line of fusalage
Details
       

 03-30-2015
3.00
Layout cut and Rivet Main Gear Fairing hinge
Details
       

 03-24-2015
3.00
Layout and cut Main Gear Fairing
Details
       

 03-23-2015
2.00
Run break lines to breaks
Details
       

 03-13-2015
4.00
Mount Tires on rims and mount
Details
       

 03-11-2015
3.00
Fit rims to Mains
Details
     

 03-09-2015
4.00
Initial Fit of Left and Right main breaks
Details
     

 03-02-2015
2.00
Install Break flanges on main
Details
     

 02-17-2015
3.50
Mount Front Gear
Details
       

 02-16-2015
3.00
Attach Main gears
Details
       

 02-10-2015
3.00
Raise Fusalage and put on Work Bench
Details
     

 02-09-2015
2.00
Bolt engine mount to fuselage
Details
     

 02-07-2015
3.00
Rerun fuel line from tank valve to pump
Details
     

 02-04-2015
1.00
Seal Fuel pump mounting hole
Details
       

 01-21-2015
2.00
Debur engine mount holes
Details

 01-20-2015
4.00
Reposition Aux Fuel Pump
Details
     

 01-02-2015
0.50
Black Front Deck under wind screen
Details
     

 12-30-2014
1.50
Prime deck under winds screen
Details
     

 12-30-2014
1.00
Drill and fit lanyard to slide seal
Details
     

 12-22-2014
3.00
Fabicate slide seal for canopy
Details
     

 12-12-2014
5.00
Final Rivet and Screw Canopy
Details
       

 12-07-2014
2.50
Reassemble Canopy for final riveting
Details
       

 12-05-2014
3.00
Prime interior canopy parts
Details
       

 12-03-2014
2.00
Fit, match drill, debur, and dimple Doghouse
Details
     

 12-03-2014
2.00
Disassemble canopy for cleanup and priming
Details
       

 11-17-2014
4.00
Final fit Canopy Skirts
Details
       

 11-11-2014
3.00
Cut and finish right side canopy skirts
Details
     

 11-10-2014
3.00
Fit rivited side and rear canopy skirts
Details
       

 11-03-2014
6.00
Assemble right and left side and rear skirts
Details
       

 10-29-2014
5.00
Match drill rear skirts to canopy
Details
     

 10-28-2014
4.00
Bend and twist rear skirts to Canopy and Fuselage
Details
     

 10-27-2014
4.00
Final Fit Right and Left Canopy Skirts
Details
       

 10-27-2014
1.00
Final drill and counter sink left side of canopy
Details

 10-22-2014
5.00
Finish drill left Canopy skirts, brace
Details
     

 10-21-2014
4.00
Match drill right left canopy skirts
Details
     

 10-15-2014
1.00
Final drill and counter sink right side of canopy
Details
     

 10-14-2014
5.00
Finish drill right Canopy skirts, brace
Details
     

 10-07-2014
4.00
Match drill right side canopy skirts
Details
       

 10-06-2014
4.00
Match drill skirt braces to canopy frame
Details
     

 10-02-2014
2.00
Fabricate Right Canopy skirt Brace
Details

 09-29-2014
3.00
Fabricate Left Canopy Skirt Brace
Details
     

 09-23-2014
5.00
Fabricate and install canopy anchor blocks.
Details
       

 09-17-2014
3.00
Attach canopy pin mounts to longerons
Details
       

 09-10-2014
4.00
Assemble and adjust canopy latch
Details
       

 09-09-2014
4.00
Cut and fit bottom Rudder tip
Details
     

 08-26-2014
3.00
Canopy slider gap
Details
       

 08-21-2014
4.00
Initial Fit of Wind Screen
Details
       

 08-14-2014
2.50
Countersink canopy holes #30
Details

 08-13-2014
1.00
Finished edge on wind screen to prevent cracking d
Details

 08-11-2014
2.00
Debur Canopy and Frame, Drill frame to #30
Details
     

 08-06-2014
4.00
Adjust canopy frame for spring of canopy
Details
       

 08-05-2014
3.00
Fit right horizontal stab tip and left elevator ti
Details
       

 08-04-2014
3.00
Uncleco Canopy from Frame
Details
       

 08-01-2014
1.50
Cut Rear of Canopy
Details
     

 07-10-2014
2.50
Cut and debur side and back Canopy skits
Details
       

 07-08-2014
5.00
Cut bottom of Canopy and Drill and Cleco to frame
Details
       

 07-03-2014
2.00
Clamp back half of Canopy to frame
Details
       

 07-01-2014
2.00
Fabricate and epoxy Vertical Stab rib
Details
     

 06-30-2014
3.00
Fabricate Horizontal Stab tip ribs
Details
       

 06-30-2014
2.00
Canopy handle hole crack
Details
       

 06-26-2014
4.00
Split Canopy
Details
       

 06-24-2014
3.00
Cut and fit Right Elevator Tip
Details
     

 06-23-2014
2.00
Cut Horizontal Stab and Vertical Stab Tips to size
Details
     

 05-30-2014
3.00
Adjusted canopy frame to follow curve of canopy
Details
       

 05-29-2014
5.00
Continue to cut and fit Canopy to frame
Details
       

 05-27-2014
4.00
Cut Molding flanges off of Canopy
Details
       

 05-23-2014
3.00
Started laying out Plexiglass canopy
Details
       

 05-20-2014
5.00
Complete Canopy rear and side track installation.
Details
       

 05-14-2014
3.00
Canopy Track Support
Details
     

 05-12-2014
5.00
Continued fitting Canopy frame to fuselage
Details
       

 05-01-2014
2.00
Start initial fit of Canopy Frame
Details
       

 05-01-2014
1.50
Drill, Countersink and fit Empanage Fairing
Details
     

 04-28-2014
3.00
Rivited Slider Canopy Track and Rail Togeather
Details
       

 04-17-2014
3.00
Start fabrication of Canopy slider track
Details
       

 04-16-2014
3.00
Match drill Canopy Slider block to Frame
Details
     

 04-14-2014
1.50
Cut Canopy Tracks
Details
       

 04-14-2014
1.00
Assemble Roller Assembly for Canopy
Details
       

 04-09-2014
3.00
Complete Bolt in of Roll Bar Brace
Details
       

 04-08-2014
3.00
Roll Bar Brace Match Drill to Roll Bar / Fwd Fusal
Details
       

 04-07-2014
3.00
Initial Fit of Roll Bar Brace
Details
       

 03-25-2014
3.00
Finish installing Roll Bar
Details

 03-24-2014
4.00
Trim Roll Bar feet to match aft Canopy Deck
Details
       

 03-17-2014
4.00
Continue Fitting Roll Bar
Details
       

 03-11-2014
4.00
Fit Roll Bar to Fusalage
Details
       

 03-04-2014
2.00
Completed fabricating Roll Bar Spacers
Details
     

 02-24-2014
2.00
Roll Bar Spacers
Details

 02-18-2014
3.00
Started laying out Roll Bar attachment
Details
       

 02-04-2014
3.50
Complete install of platenuts for Emp Fairing
Details

 01-31-2014
2.50
Install platenuts on Vertical Stabilizer edge for
Details
       

 01-29-2014
2.00
Trim Empanage Fairing to fit
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.