KitLog pro

Powered By Kitlog Pro v2.0

Neils Web Site
Work Logs Found: 178
Category Work Time: 504 Hours
 Date
Hours
Work Log Summary

Details

 05-04-2021
1.50
Fit and attach fabric spacers
Details
       

 05-03-2021
4.00
Install Top Stringer
Details
       

 04-29-2019
2.00
Runup and taxi / break test
Details

 04-01-2019
2.00
Verify Elevator Rigging
Details

 11-26-2018
3.00
Rivet left crotch strap supports to stringers
Details
       

 11-23-2018
3.00
Start installation of right Crotch Straps
Details

 11-22-2018
3.00
Rivet right crotch strap supports to stringers
Details

 11-21-2018
4.00
Start installation of right Crotch Straps
Details

 11-06-2018
2.50
Install coverings for fuel valve and pump
Details
     

 07-12-2018
3.00
Mount vents to fuselage
Details
     

 07-11-2018
3.00
Match drill left and right vents to fuselage
Details

 06-22-2018
2.00
Start installation of front vents
Details
     

 09-25-2017
3.00
Fabricate electric aileron trim brack and block
Details
     

 03-01-2016
2.00
Fabricate forward cable bracket
Details
       

 06-08-2015
2.00
Install nose gear wheel and fairing support bracke
Details
     

 04-28-2015
4.00
Install platenuts under wing and fuel tank for fai
Details

 08-28-2014
3.00
Pre attach holes from wind screen to roll bar
Details

 03-27-2014
4.00
Rivet Aft Top Skin to Fusalage
Details
     

 01-28-2014
2.00
Shape and attach right empanage gap filler
Details
     

 01-27-2014
2.00
Shape and attach left empanage gap filler
Details
       

 01-27-2014
1.00
Cleco Aft top skin on fusalage for riveting
Details
     

 01-16-2014
3.00
Debur and Dimple / countersink Fuselage top skin
Details
       

 01-09-2014
3.00
Rudder cables to pedals attach
Details
       

 12-20-2013
2.00
Attach Rudder cable clamps to Fuselage
Details
     

 12-13-2013
1.00
Remove Mid Fuselage top skin for access
Details
     

 12-13-2013
2.00
Ran Rudder cables form control horn to pedals
Details
       

 12-12-2013
2.00
Rivet platenuts to center section vertical support
Details
     

 12-11-2013
2.00
Fit flap actuator covers
Details
     

 12-10-2013
1.50
Install cabin floor covers with Clecos
Details
     

 12-09-2013
2.50
Attach Elevator push rod to controls and bell cran
Details
       

 12-06-2013
3.00
Install threaded rod to Elevator control rod
Details
       

 12-05-2013
1.50
Cut and Prime inside of small elevator push rod
Details

 11-22-2013
4.00
Completed Riveting Front Deck Skin
Details
       

 11-18-2013
3.00
Continue Riveting Forward Deck skin
Details

 11-14-2013
2.00
Start riveting front deck skin to structure and fu
Details
     

 11-14-2013
4.00
Final rivet front deck sturcture
Details
       

 11-12-2013
4.00
Fit Vents to Insturment Panel and side of Fusalage
Details
       

 11-11-2013
1.00
Reassemble forward deck structure
Details
     

 11-11-2013
3.00
Fabricate vent brackets
Details
     

 11-07-2013
5.00
Forward Deck dismantle, debur and dimple
Details
       

 11-05-2013
4.00
Fabricate and rivet side brackets for forward deck
Details
       

 11-05-2013
3.00
Debur forward deck flanges and firewall
Details
     

 11-04-2013
3.00
Match Drill forward skin to forward ribs and fire
Details

 10-31-2013
4.00
Fit forward deck skin to structure
Details
     

 10-30-2013
1.50
Debur forward fusalage deck skin
Details
     

 10-29-2013
2.00
Finiish assembling forward fuselage structure
Details

 10-28-2013
4.00
Start assembling forward fuselage structure
Details
     

 10-27-2013
2.50
Rivet forward fusalage center rib
Details
       

 10-25-2013
3.00
Forward Fuselage Center Rib Assembly
Details
       

 10-23-2013
3.00
Fabricate Various Instrument Panel parts
Details
       

 10-22-2013
4.00
Upper Attach Instrument Panel Brackets Fabrication
Details
       

 10-18-2013
3.00
Leak Test Fuel Tank plumbing
Details
       

 10-17-2013
3.00
Rivet Rudder Stops to Fusalage
Details
       

 10-16-2013
4.00
Adjust stops to allow for 35 degree deflection
Details
       

 10-15-2013
4.00
Fabricate Rudder Stops
Details
       

 10-14-2013
5.00
Mount Rudder
Details
     

 10-08-2013
2.50
Mount Empanage on Fusalage
Details
       

 10-07-2013
3.00
Match Drill and tap Emp Cover and Access Plates
Details
       

 10-03-2013
3.00
Fit Aft Side Skin to Aft Deck and Emp Gap Cover
Details
       

 10-01-2013
4.00
Remove Empanage and Debur
Details
       

 09-28-2013
4.00
Match drill and bolt Vertical Stab to Fus and HS
Details
       

 09-27-2013
4.00
Elevator stop fabrication and fitting
Details
       

 09-26-2013
1.00
Match drill attach plate to Vertical Stab
Details
     

 09-25-2013
2.00
Measure Vertical Stab from Horizontal Stab
Details
     

 09-24-2013
1.50
Prime Elavator Push Rod on outside
Details
     

 09-24-2013
2.50
Fit Vertical Stabilizer
Details
       

 09-17-2013
1.50
Cut and prime inside of elevator push rod
Details
       

 09-16-2013
4.00
Set Elevator down Deflection
Details
       

 09-10-2013
3.00
Match drill and bolt Horizontal Stabilizer to Fuse
Details
       

 09-09-2013
1.50
Fabricate shims to for Horizontal Stabilizer
Details
     

 09-09-2013
3.00
Clamp Horizontal Stabilizer on Fuselage
Details
       

 09-08-2013
2.00
Fit Horizontal Stabilizer to Fuselage
Details
       

 09-08-2013
0.00
Fit Horizontal Stabilizer to Fuselage
Details
       

 09-04-2013
2.00
Drill Elevator horn
Details
       

 08-29-2013
3.00
Elevator Horns guide hole for control tube
Details
       

 08-28-2013
0.50
Ran flex brake lines between firewall and pedals
Details
       

 08-28-2013
1.00
Provide isolation between fuel and brake lines
Details
     

 08-27-2013
3.00
Run brake lines from Fuselage floor to Fire wall
Details
       

 08-26-2013
4.00
Run Fuel line from valve to electric Fuel pump
Details
       

 08-26-2013
2.00
Ran overhead break lines from right to left pedals
Details
       

 08-23-2013
2.50
Break Fluid Reservoir and Right Pedals
Details
       

 08-22-2013
3.00
Break line fittings from inside to outside of fusa
Details
       

 08-19-2013
2.00
Rivet Fire Wall to side and bottom fusalage skins
Details
     

 08-15-2013
2.00
Route right fuel line and attach to Tank and Valve
Details
       

 08-13-2013
2.30
Route left fule line and attach to Tank and Valve
Details
       

 08-13-2013
1.50
Assemble Fuel Valve to Attach Plate
Details
       

 08-10-2013
2.00
Complete Fuel Vent Lines
Details
       

 07-26-2013
2.50
Cut holes in fuselage for fuel lines and vents
Details
       

 07-23-2013
3.00
Fuel Vent Plumbing
Details
       

 07-22-2013
5.00
Fuel Vent Plumbing
Details
       

 07-19-2013
3.00
Attach right Aileron push rod to control sticks
Details
     

 07-18-2013
3.00
Attach left Aileron push rod to control sticks
Details
     

 07-09-2013
4.00
Install Control Colum, Sticks and Push Rods
Details
     

 07-06-2013
4.00
Install right Flap and attach to Actuator
Details
       

 07-05-2013
5.00
Install left Flap and attach to Actuator
Details
       

 06-27-2013
3.00
Complete Left Tank Attach to Fuselage and Wing Att
Details
     

 06-25-2013
3.00
Complete Right Tank Attach to Fuselage and Wing
Details
     

 06-24-2013
3.00
Right Tank Attach
Details
       

 06-21-2013
3.00
Fabricate Tank Attack Brackets
Details
     

 06-12-2013
4.00
Install Lower Wing Sking to Fuselage Screws
Details
       

 06-07-2013
3.00
Tighen wing bolts
Details
       

 06-05-2013
5.00
Attach Wings to Fuselage
Details
       

 05-31-2013
6.00
Install Landing Gear Mounts
Details
       

 05-29-2013
3.00
Fit landing grear brackets to center bulkhead
Details
       

 05-24-2013
2.00
Match Drill land Gear mount to Landing gear
Details

 05-21-2013
4.00
Electric Flap Actuator Installation
Details
       

 05-20-2013
0.00
Fuselage Stand
       

 05-20-2013
5.00
Fit Flap Actuator Channel
Details
       

 05-20-2013
0.00

       

 05-15-2013
4.00
Fabricate more electric flap hardware
Details
       

 05-13-2013
3.00
Fabricate electric flap hardware
Details
       

 05-06-2013
5.00
Install flap actuator
Details
       

 05-03-2013
1.00
Drill electric actuator for safety wire
Details
       

 04-30-2013
2.00
Finished center cabin cover
Details

 04-29-2013
2.00
Fuel Valve Plate & Cover, and Center cabin cover
Details
       

 04-25-2013
4.00
Rivet Heat Baffle to Center Cabin Cover
Details
       

 04-24-2013
4.00
Rivet left seat back
Details
       

 04-22-2013
3.00
Riveted right seat back
Details
     

 04-19-2013
3.00
Disassemble, deburr and reassemble right seat bac
Details
       

 04-18-2013
4.00
Fabricated right seat back
Details
       

 04-11-2013
4.00
Fabricated left seat back
Details
       

 04-10-2013
3.00
Layed out Seat Back rivet holes
Details
     

 04-09-2013
3.00
Deburred Seat Back Support and Lightning holes
Details
     

 03-29-2013
5.00
Fabricate Seat Back Support Brackets
Details
       

 03-25-2013
1.00
Rivet Seat Floor Tunnel platenuts
Details
     

 03-21-2013
3.00
Seat Floors - Drilled, Deburred and Riveted
Details
       

 03-20-2013
3.00
Baggage area covers
Details
       

 03-19-2013
3.00
Install harness cable wear blocks
Details
       

 03-18-2013
3.00
Rivet Baggage Floors to Ribs and Bukhead
Details
       

 03-14-2013
2.00
Fit and cleco Bagage floors onto ribs
Details
     

 03-13-2013
0.10
EAA Technical Counselor Inspection
Details
     

 03-13-2013
3.00
Bolted and Riveted Steps to Fuselage
Details
       

 03-12-2013
2.00
Remove steps and debur fuselage skins
Details
     

 03-12-2013
1.50
Prime Steps
Details
       

 03-11-2013
3.00
Fit left step to Fuselage.
Details
       

 03-07-2013
3.00
Fab baggage bulkhead wear blocks and washers
Details

 03-05-2013
4.00
Fit right step to Fuselage.
Details
       

 03-04-2013
2.00
Step Installation - Drill out aft bagages covers
Details
     

 02-25-2013
4.00
Drill in Rib stiffeners to aft top Skins
Details
       

 02-20-2013
2.00
Cleco Aft top skin to Bulkheads and Longerons
Details
     

 02-19-2013
2.00
Debur and prep Aft Top Skin
Details
     

 02-18-2013
3.00
Fix QB angle clip for F-787 Web Stiffener
Details
       

 02-14-2013
4.00
Fabricate and install Elevator Bellcrank
Details
       

 02-12-2013
4.00
Rivet mid fuselage gussets
Details
       

 02-11-2013
4.00
Trim mid fuselage gussets for slider
Details
       

 02-04-2013
4.00
Cut and install Rudder Pedal Brace
Details
     

 01-28-2013
5.00
Build rudder pedal assembly
Details
     

 01-17-2013
4.00
Fabricate various Rudder control parts
Details
       

 01-16-2013
3.00
Completed Rudder Pedals
Details
       

 01-15-2013
3.00
Deburr and dimple Rudder pedal parts
Details
       

 01-14-2013
3.00
Cut Rudder pedals per plans
Details
       

 01-10-2013
4.00
Started fabricating Rudder pedals
Details
       

 01-08-2013
3.00
Cut holes in lower skin for Main gears
Details
       

 12-31-2012
1.50
Drill step holes in side skins
Details
     

 12-31-2012
1.50
Cleco firewall, longeron, and corner brackets to s
Details
     

 12-28-2012
3.00
Cut Step holes in Baggage Ribs
Details
     

 12-27-2012
1.50
Tap Seat Rib Nutplates
Details

 12-26-2012
3.00
Continued to verify plans to Quick Build Fuselage
Details

 12-21-2012
4.00
Rear Bulkhead
Details
       

 12-20-2012
1.50
Prime Rear tie down bracket
Details
     

 12-19-2012
3.50
Fabricate rear tie down bracket
Details
       

 12-18-2012
4.00
Removed aft Bulkhead from Fuselage
Details
       

 12-17-2012
4.00
Verify Quick Build Fuselage against plans
Details

 12-13-2012
1.50
Rivet right upper bulkhead
Details
     

 12-13-2012
2.00
Drill and fit Flap bearing blocks
Details
     

 12-11-2012
1.50
Rivet left upper bulkhead
Details
     

 12-11-2012
2.00
Bolt Control column to bulkhead
Details
     

 12-10-2012
1.50
Rivet Seat support Brackets to Mid Bulkhead
       

 12-10-2012
2.50
Cut and double inside seat back ribs
Details
     

 12-07-2012
4.00
Drill, deburr and dimple seat supports
Details
     

 12-06-2012
3.00
Fabricated seat back brackets and shims
     

 12-04-2012
3.00
Removed QB inner floor and cargo covers
Details
       

 12-03-2012
3.00
Drilled out Inner seat ribs for Control Arm Access
Details
     

 11-29-2012
2.00
Rivet Break line bracket to firewall
Details
     

 11-27-2012
2.50
Riveted Aux Fuel pump doubler to Firewall
Details
     

 11-26-2012
5.00
Fabricate Aux Fuel Pump Doubler and drill firewall
Details
       

 11-26-2012
1.00
Cleco / Match Drill Firewall Recess
Details
     

 11-26-2012
1.00
Cleco / Match Drill Brake line bracket to Firewall
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.