KitLog pro

Powered By Kitlog Pro v2.0

Neils Web Site
Work Logs Found: 853
Category Work Time: 2417 Hours
 Date
Hours
Work Log Summary

Details

 05-02-2022
5.00
Install and Plumb Pitot - Static
Details
       

 05-04-2021
1.50
Fit and attach fabric spacers
Details
       

 05-03-2021
4.00
Install Top Stringer
Details
       

 04-29-2019
2.00
Runup and taxi / break test
Details

 04-17-2019
2.00
Verify Max deflection of rudder
Details
     

 04-15-2019
5.00
Aileron Rigging
Details

 04-12-2019
5.00
Aileron Rigging
Details
       

 04-01-2019
2.00
Verify Elevator Rigging
Details

 03-07-2019
1.00
Compression Test and Runup
Details

 03-06-2019
4.00
Pitot Static and Transponder checks
Details

 03-05-2019
2.00
Configure engine guages
Details
       

 03-01-2019
4.00
Calabrate fuel Guages
Details

 02-28-2019
3.00
Repair fuel sender
Details
     

 02-26-2019
3.00
Magnetometer calibration
Details

 02-25-2019
3.00
AHARS Setup
Details

 02-22-2019
2.00
Update Software for G3x and GTN650
Details

 02-21-2019
3.00
Install Co Pilot Control Grip
Details
     

 02-21-2019
3.00
Install Co Pilot Control Grip
Details
     

 02-15-2019
1.50
Warning Placards
Details
       

 02-14-2019
2.00
Install Sealt belts and Temporary Seats
Details
     

 02-13-2019
4.00
Replace Temporary Cowel pins
Details
     

 02-06-2019
3.00
First Start of Engine
Details
     

 11-26-2018
3.00
Rivet left crotch strap supports to stringers
Details
       

 11-23-2018
3.00
Start installation of right Crotch Straps
Details

 11-22-2018
3.00
Rivet right crotch strap supports to stringers
Details

 11-21-2018
4.00
Start installation of right Crotch Straps
Details

 11-20-2018
4.00
Custom Mag / Start wring
Details

 11-19-2018
4.00
Custom Mag / Start wiring
Details
     

 11-16-2018
2.00
Fabricate right P-Lead
Details

 11-15-2018
3.00
Fabricate left p lead
Details
       

 11-14-2018
2.00
Install fairig between fusalage and empennage
Details
     

 11-13-2018
2.00
Install PC-680 Battery
Details
     

 11-12-2018
4.00
Fuel Testing
Details
       

 11-11-2018
4.00
Fuel Testing
Details

 11-10-2018
4.00
Fuel Testing
Details

 11-09-2018
2.00
Fuel Testing
Details

 11-07-2018
2.00
Mount and test fuel selector
Details
     

 11-06-2018
2.50
Install coverings for fuel valve and pump
Details
     

 11-05-2018
3.00
Replaced electronic fuel pump
Details

 11-02-2018
4.00
Electric fuel pump test
Details

 10-18-2018
3.00
Fabricate Fuel valve indicator plate
Details
     

 09-21-2018
12.00
Completed finishing of windscreen fairing
Details
     

 08-27-2018
5.00
Split canopy and windscreen
Details

 08-16-2018
3.00
Add 3 inch strip of fiberglass to base of windscre
Details
       

 08-15-2018
2.00
Add 2 inch strip of fiberglass to base of windscre
Details

 08-14-2018
2.00
Add 1 inch strip of fiberglass at base of windscre
Details

 08-13-2018
2.00
Add 1/2 strip of fiberglass at base of windcreen
Details

 08-12-2018
2.00
Fill gap beween windscreen and fusalage
Details

 08-10-2018
3.00
Layout and mask windscreen fiberglass
Details
       

 08-09-2018
5.00
Complete installation of windscreen
Details
       

 08-08-2018
3.00
Start installing windscreen
Details
     

 07-13-2018
2.50
Complete Vents
Details
     

 07-12-2018
3.00
Mount vents to fuselage
Details
     

 07-11-2018
3.00
Match drill left and right vents to fuselage
Details

 07-11-2018
2.00
Apply filler between windscreen and fusalage
Details

 06-22-2018
2.00
Start installation of front vents
Details
     

 06-21-2018
3.00
Secure wiring from panel to fuselage
Details
       

 06-20-2018
2.00
Mount cabin heat cable
Details
     

 06-19-2018
2.00
Mount carb filter bypass on sub panel
Details
     

 06-18-2018
2.00
Co-Pilot Grip wiring
Details
     

 06-15-2018
2.00
Control stick wiring for Co-Pilot Side
Details
     

 06-14-2018
2.00
Control stick wiring for Pilot Side
Details
     

 06-06-2018
3.00
Complete install of ELT
Details
     

 05-31-2018
4.00
Terminate and Fabricate ELT wiring
Details
       

 05-29-2018
5.00
Mount ELT
Details
     

 05-18-2018
4.00
Install ELT Antenna
Details
     

 05-01-2018
4.00
Install AOA display
Details
       

 04-28-2018
4.00
Finish triming and install right wingtip lense
Details
     

 04-27-2018
4.00
Start triming right wingtip lens
Details

 04-26-2018
3.00
Install VOR antenna
Details
     

 04-25-2018
3.00
Prep right wing tip and VOR antenna for install
Details

 04-24-2018
3.00
Install right Strobe / Nav lights into wingtip
Details
     

 04-11-2018
3.00
Run coax for VOR antenna in right wing
Details
       

 04-10-2018
3.00
Install landing and taxi lights into right wing ti
Details
     

 04-09-2018
4.00
Continue installing antennas
Details
       

 04-03-2018
3.00
Continue installing antennas
Details
       

 03-26-2018
3.00
Continue installing antennas
Details
       

 03-09-2018
3.00
Rivet Doubler Plates for Atnennas
Details
     

 03-07-2018
3.00
Wire Taxi and Landing lights to Panel
Details

 03-06-2018
3.00
Fit Landing, Taxi and Nav lights to right wing tip
Details
     

 03-05-2018
2.00
Alodine and prime bottom of antenna doublers
Details
     

 03-02-2018
2.00
Prep all 6 antenna douplers for Alodine
Details
     

 03-01-2018
3.00
Drill out Com 1 Doubler
Details
     

 02-20-2018
4.00
Drill in Doubler plates for GPSs
Details
       

 02-19-2018
4.00
Drill in Doubler plates for Trans, ADSB and Com2
Details
       

 02-16-2018
5.00
Mount and wire rudder strobe
Details
       

 12-19-2017
3.00
Drill and rivet nut plates for lower rudder cap
Details
     

 12-18-2017
4.00
Bond and Fill Right Wingtip Insert
Details
     

 12-16-2017
3.00
Fabricate bracket for relay decks
Details
     

 12-12-2017
3.00
Cut and fit instert into right Wing Tip
Details
     

 12-11-2017
3.00
Install Left Wingtip and test Lighting
Details
       

 12-08-2017
3.00
Run RG400 coax for Antennas
Details
       

 12-07-2017
4.00
Antenna Pre Installation
Details

 12-06-2017
3.00
Terminate wiring left on wingtip and wing
Details
       

 12-05-2017
4.00
Complete fit of left wingtip lens
Details
     

 12-04-2017
3.00
Initial cut of left wingtip lens
Details
     

 12-01-2017
4.00
Wire flap position sensor
Details
       

 11-28-2017
3.00
Run wire between rudder and panel for Strobes
Details

 11-27-2017
4.00
Wire and install Elevator Trim
Details
     

 11-20-2017
5.00
Install Flap Position Sensor
Details
     

 11-06-2017
3.50
Calabrate Aileron Trim for Panel
Details
     

 11-03-2017
1.50
Power Panel for first time
Details
     

 11-02-2017
3.00
Install Pitot Heat breaker and switch
Details
       

 11-01-2017
2.50
Drill panel for pitot heat breaker and switch
Details
     

 10-31-2017
4.00
Fit left Wingtip Nav and Strobe lights
Details
     

 10-30-2017
4.00
Fit left Wingtip landing and Taxi lights
Details
     

 10-27-2017
4.00
Final fit of Autopilot Pitch Servo
Details
       

 10-26-2017
3.00
Initial assembly and fitting for Autopilot Pitch S
Details
       

 10-24-2017
4.00
Complete Electric Trim attachment to Ailerons
Details
       

 09-29-2017
3.00
Complete Static Port Plumbing
Details
       

 09-28-2017
4.00
Install Static Ports
Details
       

 09-27-2017
4.00
Install Aileron trim motor and bracket btw ribs
Details
     

 09-26-2017
2.00
Attach trim motor to Aileron trim bracket
Details
     

 09-25-2017
3.00
Fabricate electric aileron trim brack and block
Details
     

 09-20-2017
3.00
AHRS plumbing and electrical connections
Details
     

 09-19-2017
1.50
Run OAT wire to AHRS and repin to DB15
Details

 09-19-2017
1.50
Fill joint between wingtip cutout and wingtip
Details
     

 09-18-2017
3.00
Fabricate and install doubler for OAT
Details
       

 09-08-2017
4.00
Run wire for OAT from wing to AHRS
Details
     

 09-07-2017
2.00
Install GMU 22
Details
     

 09-06-2017
2.50
GMU 22 mount plate and bracket
Details
     

 08-22-2017
4.00
Drill fuselage bulkheads for wire routing
Details
     

 08-21-2017
5.00
Fabricate and install right arm rest channel
Details
     

 08-18-2017
3.00
Installed Right Arm rest channel
Details
     

 08-17-2017
3.00
Right wiring channel
Details
     

 08-16-2017
2.00
Install GSU25 (AHRS) to back of GDU460
Details
     

 08-15-2017
2.00
Replace floor boards
Details

 08-04-2017
3.00
Cut wingtip inserts for lighting
Details
     

 08-03-2017
3.00
Cut left wingtip for lighting insert
Details
     

 08-02-2017
2.00
Run 12ga wire from pitot to panel
Details

 08-01-2017
3.00
Install Pitot / AOA sensor
Details
       

 07-31-2017
3.00
Rivet Pitot Support hardware onto left wing
Details

 06-28-2017
8.00
Install Auto Piltot Roll Servo
Details
     

 06-27-2017
1.50
Prime Pitot Support Hardware
Details
     

 06-26-2017
4.00
Cut hole in lower left wing for Pitot and AOA
Details
     

 06-23-2017
4.00
Run tubes for Pitot and AOA
Details
     

 06-22-2017
3.50
Install wiring for left wing lights to panel
Details

 06-21-2017
3.00
Route wiring from Pilot stick
Details

 06-20-2017
2.50
Route wiring from Co Pilot stick
Details
     

 06-19-2017
3.50
Install wiring for right wing lights to panel
Details
     

 06-16-2017
2.00
Fuel transducer hoses
Details
     

 06-15-2017
2.00
Route connection to Right wing fuel level sender
Details
     

 06-13-2017
5.00
Run cable thru wing for Auto Pilot Roll Servo
Details
       

 06-12-2017
3.50
Attach connector shells for engine sensors
Details
       

 06-09-2017
3.00
Run cable from GEA24 thur fire wall
Details
       

 06-08-2017
3.00
Attach pins to Oil, Fuel, Manafold, engine sensors
Details
     

 06-07-2017
2.00
Connect and test Primer valve power
Details
       

 06-06-2017
4.00
Install Fuel Flow Transducer
Details
     

 05-25-2017
2.50
Install RPM sensor on right (non implulse) mag
Details
     

 05-24-2017
2.00
Install Oil temp/pres, MP, fuel pres sensors
Details
       

 05-24-2017
3.00
Fit and drill in Pitot and AOA mount
Details
       

 05-23-2017
3.00
Complete contection GEA24 to EGT and CHT probes
Details
     

 05-22-2017
3.00
Start connecting GEA24 harness to EGT CHT
Details
     

 05-16-2017
3.00
Run wire harnes from GEA 24 to probe locations
Details
     

 05-15-2017
3.00
Install EGT Probes
Details
     

 05-12-2017
3.00
Install stainless steel primer lines
Details
       

 05-09-2017
3.00
Install and wire primer selonoid switch
Details
       

 05-04-2017
3.00
Install fuel primer selenoid valve
Details
     

 04-26-2017
3.00
Power control wiring
Details
       

 04-24-2017
1.50
Drill hold for Avionics power lead and contactors
Details
     

 04-23-2017
3.00
Mount Avionics bus and Common Ground
Details
     

 04-17-2017
3.00
Install Panel and start connecting interfaces
Details
       

 04-13-2017
2.00
Fabricate and Install Alternator Cables
Details
       

 04-05-2017
2.00
Mount fuse holder for alternator
Details
     

 04-04-2017
2.00
Mount interface Avionics to sub panel
Details
     

 04-03-2017
3.00
Install Platenuts on left sub panel
Details

 04-01-2017
3.00
Install Platenuts on right sub panel
Details

 03-27-2017
3.00
Mounted Transponder onto back of Sub Panel
Details

 03-24-2017
4.00
Repair Panel mounting brackets
Details
     

 03-19-2017
4.00
Fit panel into foward fusalage
Details
       

 03-09-2017
4.00
Modify sub panel and center Rib for avionics panel
Details
       

 03-06-2017
5.00
Fit panel onto mockup of forward ribs and subpanel
Details
       

 03-03-2017
2.00
installed egt sensors
Details
     

 03-01-2017
3.00
Layed out Panel and associated avionics
Details
     

 02-28-2017
3.00
Change support for ignition wires
Details
       

 02-27-2017
3.00
Change Battery and Start Relay Connection
Details
     

 02-25-2017
4.00

Details

 02-15-2017
5.00
Uncreated Panel and inventory contents
Details
     

 02-06-2017
5.00
Install high apmerage wiring
Details
       

 02-01-2017
4.00
Torque prop bolts - Safety Wire and istall spinner
Details
       

 01-27-2017
2.00
Remounteed prop
Details
       

 01-26-2017
3.00
Test clearances from spinner and gap fillers
Details

 01-25-2017
4.00
Fabricate Prop gap filer (other side)
Details
     

 01-23-2017
5.00
Fabricate Prop gap filer (one side)
Details
       

 01-19-2017
3.00
Remove rear spinner plate and install platenuts
Details
       

 01-18-2017
4.00
Remove prop and install platenuts in front plate
Details
     

 01-17-2017
4.00
Drill spinner to front and rear mount plates
Details
       

 01-16-2017
5.00
Remount prop and true spinner
Details
     

 01-13-2017
4.00
Cut Spinner for prop blade access
Details
       

 01-12-2017
4.00
Remove Prop and make template for spinner
Details
       

 01-11-2017
4.00
Install oil access door
Details
       

 01-10-2017
4.00
Fabricate door and hinge for oil access
Details

 12-21-2016
4.00
Complete left wheel pant
Details
       

 12-19-2016
3.00
Additonal trim of left wheel pant
Details
     

 12-15-2016
4.00
Reinforce and rivet left outer wheel pant bracket
Details
     

 12-12-2016
3.00
Initial trim of left main wheel pant
Details
     

 12-06-2016
2.00
Final fit of fairing btw front gear and Cowl
Details
     

 12-03-2016
3.00
Initial fit of fairing btw front gear and Cowl
Details
     

 12-03-2016
2.00
Final fit of Right Wheel pant and intersection fai
Details
     

 12-02-2016
3.00
Initial fit of Right Wheel Pant fairing
Details
     

 11-28-2016
5.00
Fit and drill Right wheel pant
Details
     

 11-16-2016
4.00
Align Right wheel pant with fusalage center line
Details
       

 11-15-2016
2.00
Addl trim of Right Wheel pant to fit around axel
Details
     

 11-07-2016
3.00
Refit front gear fairing with hinge
Details
     

 11-04-2016
5.00
Fabricate and and install hinge on front gear fair
Details
     

 10-31-2016
3.00
Initial trim and fint of front gear fairing
Details
     

 10-27-2016
3.00
Continue to trim and fit front wheel pant
Details
     

 10-20-2016
5.00
Initial fit of Right Wheel Pant
Details
     

 10-17-2016
7.00
Fit nose gear wheel pant to front gear
Details
       

 10-07-2016
3.00
Start fitting nose wheel pant
Details

 10-06-2016
2.00
Fit and attach right intersection fairing
Details
     

 10-05-2016
2.50
Fit and attach left intersection fairing
Details
     

 10-03-2016
2.00
Fixed leak in break lines
Details

 09-30-2016
3.00
Filled and bleed break lines
Details

 09-13-2016
4.00
Revised Scat Tubing routing - Continued
Details
       

 09-12-2016
4.00
Revised Scat Tubing routing
Details
       

 09-06-2016
3.50
Fabricate right lower cowel inlet seal and clamp
Details
       

 09-05-2016
2.00
Bond forward air seals to clamps
Details
     

 09-02-2016
3.50
Fabricate left lower cowel inlet seal and clamp
Details
       

 09-01-2016
4.00
Install Cooling Blast Tubes on Magnetos and Altern
Details
       

 08-25-2016
3.00
Drill debur and rivet air seal - Front
Details
       

 08-24-2016
2.50
Drill debur and rivet air seal - left side
Details
     

 08-23-2016
2.50
Drill debur and rivet air seal - aft
Details
     

 08-22-2016
2.50
Drill debur and rivet air seal - right side
Details
     

 08-19-2016
4.50
Fabricate Air Seal between baffle and top cowel
Details
       

 08-18-2016
2.00
Plumb Oil cooler to engine
Details
     

 08-17-2016
2.50
Install Oil Cooler
Details
     

 08-16-2016
4.00
Fabricate and install 3 remaining tension rods
Details
     

 08-15-2016
2.50
Fabricate and install Cyl 1&3 Tension rod
Details
     

 08-12-2016
1.50
Route Magneto wires to lower plugs
Details
       

 08-11-2016
3.00
Route Magneto wires to top spark plugs
Details
       

 08-10-2016
1.00
Fill spark plug access holes in baffle per plans
Details
     

 08-09-2016
3.00
Fabricate and install Baffle clips
Details
     

 08-08-2016
4.00
Finished trimming baffle to fit under cowl
Details
     

 08-05-2016
5.00
Continue triming top of baffle to fit under cowel
Details

 08-04-2016
4.00
Continue triming top of baffle to fit under cowel
Details

 08-03-2016
3.00
Continue triming top of baffle to fit under cowel
Details

 08-02-2016
3.00
Continue triming top of baffle to fit under cowel
Details

 08-01-2016
3.00
Continue triming top of baffle to fit under cowel
Details

 07-22-2016
4.00
Started trimming baffles to fit under top cowl
Details
       

 07-21-2016
2.50
Debur dimple and rivet right gusset
Details
     

 07-20-2016
3.00
Debur dimple and rivet left gusset
Details
     

 07-12-2016
3.00
Match drill Gussets forward ramps and side baffles
Details

 07-11-2016
3.00
Trim and fit Flywheel baffles
Details
       

 07-07-2016
4.00
Fabricate forward baffle gussets
Details
       

 07-06-2016
3.00
Rivet on ramps to stiffeners
Details
       

 07-06-2016
1.00
Rivet left ramp support to left ramp
Details
     

 07-05-2016
2.50
Cut matchdrill and fit left ramp support
Details
     

 06-28-2016
2.50
Complete left intake ramp
Details
     

 06-27-2016
2.50
Complete fitting of right baffle ramp
Details
     

 06-22-2016
4.00
Continue triming and bending Baffle
Details
       

 06-21-2016
5.00
Start trimming Baffles to fit air intakes
Details
       

 06-20-2016
2.00
Reattach baffles to top of engine
Details

 06-17-2016
2.00
Fill gaps BTW upper Cowel and Air intakes
Details

 06-16-2016
2.00
Air Intake Ducts
Details
     

 06-08-2016
2.00
Rivet lower fire wall
Details
     

 06-07-2016
4.00
Complete installation of lower cowl bracket
Details
       

 06-01-2016
4.00
Fit lower cowel bracket
Details
     

 05-30-2016
3.00
Complete Left intake ramp and baffle
Details

 05-25-2016
2.00
Drill engine support for lower cowel support brack
Details

 05-24-2016
4.00
Run and connect control cables to Carb.
Details
       

 05-23-2016
2.00
Fabricate brackes for Carb Heat and Finter Bypass
Details
     

 05-11-2016
4.00
Complete Airbox fabrication
Details
     

 05-09-2016
4.00
Complete lower Cowel Air gap fabrication
Details
       

 05-03-2016
3.00
Fabricate and install flter bypass door
Details
     

 05-02-2016
2.00
Start Filter bypass installation
Details
     

 04-27-2016
3.00
Completed Carb heat assembly
Details
     

 04-22-2016
8.00
Fabricate new AirBox
Details
       

 04-13-2016
3.50
Run Throttle and Mixture cables
Details
       

 04-11-2016
2.50
Cowel Air Inlet
Details
     

 04-11-2016
2.00
Airbox heat input
Details
       

 04-01-2016
2.50
Sand fiberglass / epoxy to shape
Details

 03-30-2016
2.50
Epoxy fiberglass strips around cowl foam
Details
       

 03-30-2016
2.00
Attached heat control cable
Details
     

 03-29-2016
3.00
Carve foam plug in cowl to fit Air box
Details
     

 03-28-2016
3.50
Start fill of gap between Air Box and Lower Cowel
Details
       

 03-23-2016
2.50
Install Prop Governor Cable
Details
       

 03-22-2016
2.00
Drill control cable bracket
Details
     

 03-21-2016
4.00
Mount Prop Governor
Details
     

 03-15-2016
5.00
Fabricate Carb Heat Valve
Details
     

 03-11-2016
3.00
Mount Air Box / Carb and check for cowl fit
Details
       

 03-10-2016
3.00
Drill and trim air box to top plate
Details
       

 03-09-2016
4.00
Fit Air box Top Plate Horizontal and Vertical
Details
     

 03-07-2016
3.00
Riveted hinges to cowl
Details
     

 03-01-2016
2.00
Fabricate forward cable bracket
Details
       

 02-29-2016
2.00
Engine bolts
Details
     

 02-29-2016
2.00
Cowl cleanup 1
Details
       

 02-25-2016
3.00
Adjusted cowl hinges after bonding
Details

 02-22-2016
3.00
Bonded lower right side and bottom hinges to cowl
Details
     

 02-19-2016
0.00
Packed up workshop and installed insulation
Details
       

 12-17-2015
5.00
Refit top cowl to fusalage and botton cowl
Details

 12-16-2015
3.00
Bond top fusalage hinges to top cowl with flox
Details

 12-16-2015
3.00
Bond side hinges to top cowl with flox
Details

 12-15-2015
3.00
Drill / deburr holes to lower cowel hinges for bon
Details
       

 12-14-2015
3.00
Drill / deburr holes to upper cowel hinges for bon
Details
       

 12-07-2015
3.00
Fit hinges to right and left sides
Details
       

 12-07-2015
0.00
EAA 643 Invitation
Details

 11-26-2015
5.00
Cut and trim side of bottom Cowl to fit top cowl
Details
       

 11-24-2015
3.00
Fit bottom hing to lower cowl
Details
     

 11-23-2015
3.00
Initial fit of top and bottom Cowl
Details
       

 11-17-2015
4.00
Assemble Carb support plate and filter brackets
Details
     

 11-16-2015
2.00
Drill top cowl to piano hinges
Details
       

 11-13-2015
1.00
Received Panel
Details
       

 11-12-2015
1.00
Cut top cowl as per layout
Details

 11-11-2015
2.00
Lay out top cowl for triming
Details
       

 11-10-2015
3.00
Finish installing cowl support piano hinges
Details
       

 11-09-2015
1.50
Reseal Air Filter
Details
     

 11-09-2015
3.00
Continue installing cowl hinges
Details
       

 11-07-2015
1.00
Cut hole for oil door in upper cowl
Details
     

 11-05-2015
3.00
Install piano hinge for top cowl attach to fusala
Details
     

 11-02-2015
3.00
Temporarily fit lower cowl
Details
       

 11-02-2015
1.00
Cut length of air box to fit lower cowel
Details
     

 10-31-2015
4.00
Fit Air Box Filter
Details
     

 10-29-2015
3.00
Start Air Box installation & fabrication
Details
     

 10-28-2015
4.00
Mount Prop on Engine
Details
       

 10-27-2015
2.50
Mount spinner rear bulkhead to prop
Details
     

 10-26-2015
2.00
Fit spinner back plate to doubler
Details
     

 10-26-2015
2.00
Drill out firewall to fusalage rivets
Details

 10-25-2015
1.50
Cut slot in lower cowl for front gear
Details
     

 10-23-2015
5.00
Fabricate Exit Air Attach Brack for lower cowel
Details
     

 10-19-2015
4.00
Fabrication and initial fit of baffle on ramps
Details
     

 10-17-2015
2.00
Start fabrication of forward baffles
Details
     

 10-17-2015
3.00
Prelim fit cyl 1 & 2 baffles
Details
     

 10-15-2015
4.00
Prelim fit of cyl 3 & 4 baffle
Details
     

 10-14-2015
5.00
Continue baffle fabrication cyl 1&2
Details
       

 10-08-2015
4.00
Continue baffle fabrication Cyl 3
Details
       

 10-07-2015
3.50
Continue baffle fabrication Cyl 4
Details
       

 10-06-2015
1.50
Reroute Breather over exhaust
Details
     

 10-06-2015
3.00
Continue fabricating engine baffling Cyl 4
Details
     

 10-01-2015
6.00
Start fabrication of engine baffle
Details
       

 09-28-2015
3.00
Complete installation of Exhaust
Details
       

 09-25-2015
3.00
Fabricate and install side exhaust hangers
Details
     

 09-24-2015
2.00
Initial Tail Pipe fitup
Details
     

 09-15-2015
4.00
Install Exhaust pipes to cylinders
Details
     

 09-11-2015
1.00
Fuel pump drain
Details
     

 09-11-2015
0.50
Attach fuel line between Gascolator and pump
Details
     

 09-10-2015
2.00
Attach fuel lines between engine pump and carb
Details
       

 09-09-2015
2.00
Fit Oil pressure and Breather tubes
Details
       

 09-07-2015
1.00
Install control cable bracket and carburetor
Details
     

 09-01-2015
5.00
Installed engine
Details
       

 08-31-2015
1.00
Received O-320 Engine from Lycoming
Details

 08-27-2015
1.50
Locate and drill firewall holes for Mixture and Pr
Details
     

 08-25-2015
1.00
Final fit left wing tip
Details
     

 08-24-2015
1.50
Drill and dimple mounting holes in wings for tips
Details
     

 08-21-2015
3.00
Rivet platenuts to left wingtip
Details
     

 08-17-2015
2.00
Drill and dimple for recessed screws and rivets
Details
     

 08-14-2015
3.00
Drill reinforcement strip and clecos to left Wing
Details
     

 08-11-2015
1.50
Rivet left wingtip outside rib to wingtip
Details

 08-11-2015
1.00
Drill left wingtip to left wing
Details
     

 08-10-2015
1.50
Drill, cleco, debur, and prime left outside wing r
Details

 08-03-2015
2.00
Rivet left inside wing tip rib to wing tip
Details
     

 07-31-2015
2.00
Bond left inside wing tip rib to rib
Details

 07-29-2015
4.00
Drill and fit left wing tip ribs into wing tip
Details
       

 07-28-2015
1.00
Debur and prime left wingtip ribs
Details

 07-24-2015
3.00
Trim left Wing Tip to fit
Details
     

 07-08-2015
3.00
Run fuel line between boost pump and Gascollato
Details
     

 07-07-2015
2.00
Sealed Heat Bypass vent to firewall
Details
     

 07-07-2015
0.50
Sealed firewall front gear bolt hole
Details
     

 07-06-2015
2.00
Seal and Bolt Gascollator to fire wall
Details
       

 07-06-2015
2.00
Drilled and fit Heat Bypass vent to fire wall
Details
     

 07-03-2015
4.00
Install Gascollator Doubler
Details
     

 07-01-2015
0.50
Drill Gascolator fitting hole in firewall and doub
Details

 07-01-2015
1.00
Debur Firwall Gascolator doubler holes
Details

 06-25-2015
2.00
Drilled in Gascolator doubler plate
Details
     

 06-24-2015
1.00
Battery Box Retainer
Details
     

 06-23-2015
3.50
Debur, dimple, rivet, battery box to outside brack
Details
       

 06-22-2015
4.00
Drill battery box to fire wall
Details
       

 06-19-2015
4.00
Mount relays to firewall
Details
       

 06-18-2015
2.00
Match drill dimple and counter sink relay doubler
Details
       

 06-16-2015
2.00
Fabricate Relay Doubler
Details
     

 06-13-2015
0.50
On the gears
Details
     

 06-08-2015
1.50
Nose Faring support brackets
Details

 06-08-2015
2.00
Install nose gear wheel and fairing support bracke
Details
     

 06-05-2015
2.00
Ordered Engine and Prop
Details

 06-03-2015
1.50
Set Breakout force for nose wheel
Details
     

 06-03-2015
1.50
Nose wheel fairing bracket
Details
     

 06-02-2015
1.00
Mount front gear tire to wheel
Details
     

 06-02-2015
2.50
Mount Front Gear Fork on front gear
Details
     

 05-18-2015
1.50
Mount and Safety wire outer wheel pant brackets
Details
     

 05-18-2015
0.50
Cut vertical wheel pant spacing blocks
Details
     

 05-13-2015
2.00
Install plate nuts on wheel pants
Details
     

 05-12-2015
2.00
Sand wheel pants seams smooth
Details
     

 05-11-2015
2.00
Sand epoxy fiberglass and fill divits
Details
     

 05-08-2015
1.50
Add epoxy coated fiberglass to even seams
Details
     

 05-07-2015
3.00
Temporarily fit wheel pants together
Details
       

 05-06-2015
3.00
Straighten Seams of mail wheel pants
Details
     

 05-05-2015
3.00
Install rubber wing faiing gap filler
Details
       

 05-04-2015
4.00
Final fit of left wing root fairing
Details
     

 05-01-2015
4.00
Fit and trim left wing Fairing
Details

 04-30-2015
4.00
Install platenuts under left wing and fuel tank f
Details

 04-29-2015
2.00
Final fit Right wing root fairing
Details
     

 04-28-2015
4.00
Install platenuts under wing and fuel tank for fai
Details

 04-27-2015
4.00
Fit and trim right wing Fairing
Details
       

 04-10-2015
2.00
Complete installation of Left main Fairing
Details
     

 04-09-2015
2.00
Center left Fairing with extended line of fusalage
Details

 04-08-2015
3.00
Layout cut and Rivet left Main Gear Fairing hinge
Details

 04-07-2015
3.00
Layout and cut left gear fairing
Details

 04-06-2015
2.00
Complete installation of Right Fairing
Details
     

 04-03-2015
2.00
Reinforce and Faring Fingers
Details
     

 04-03-2015
2.00
Center Fairing with extended line of fusalage
Details
       

 03-30-2015
3.00
Layout cut and Rivet Main Gear Fairing hinge
Details
       

 03-24-2015
3.00
Layout and cut Main Gear Fairing
Details
       

 03-23-2015
2.00
Run break lines to breaks
Details
       

 03-13-2015
4.00
Mount Tires on rims and mount
Details
       

 03-11-2015
3.00
Fit rims to Mains
Details
     

 03-09-2015
4.00
Initial Fit of Left and Right main breaks
Details
     

 03-02-2015
2.00
Install Break flanges on main
Details
     

 02-17-2015
3.50
Mount Front Gear
Details
       

 02-16-2015
3.00
Attach Main gears
Details
       

 02-10-2015
3.00
Raise Fusalage and put on Work Bench
Details
     

 02-09-2015
2.00
Bolt engine mount to fuselage
Details
     

 02-07-2015
3.00
Rerun fuel line from tank valve to pump
Details
     

 02-04-2015
1.00
Seal Fuel pump mounting hole
Details
       

 02-02-2015
2.50
Rivet Plate Nuts to Right Wing tip
Details
     

 01-28-2015
3.00
Bond attachment strip to inside of Wingtip
Details
     

 01-26-2015
2.00
Drill Wing Tip for Plate nut attachment to Wing
Details
     

 01-22-2015
2.00
Rivet right wingtip ribs to wingtip
Details
       

 01-21-2015
2.00
Debur engine mount holes
Details

 01-20-2015
4.00
Reposition Aux Fuel Pump
Details
     

 01-06-2015
3.00
Initial fit of Engine mount
Details
     

 01-06-2015
1.00
Back drill wing tip rib after bonding
Details
     

 01-05-2015
1.00
Bond wing tip rib to inside of right wing tip
Details
     

 01-02-2015
0.50
Black Front Deck under wind screen
Details
     

 12-30-2014
1.50
Prime deck under winds screen
Details
     

 12-30-2014
1.00
Drill and fit lanyard to slide seal
Details
     

 12-22-2014
3.00
Fabicate slide seal for canopy
Details
     

 12-15-2014
2.00
Rivet doghouse to rear canopy skirt
Details
       

 12-12-2014
5.00
Final Rivet and Screw Canopy
Details
       

 12-07-2014
2.50
Reassemble Canopy for final riveting
Details
       

 12-05-2014
3.00
Prime interior canopy parts
Details
       

 12-03-2014
2.00
Fit, match drill, debur, and dimple Doghouse
Details
     

 12-03-2014
2.00
Disassemble canopy for cleanup and priming
Details
       

 11-24-2014
4.00
Drilled and Cleco Right Wing tip to Wing
Details
     

 11-17-2014
4.00
Final fit Canopy Skirts
Details
       

 11-11-2014
3.00
Cut and finish right side canopy skirts
Details
     

 11-10-2014
3.00
Fit rivited side and rear canopy skirts
Details
       

 11-03-2014
6.00
Assemble right and left side and rear skirts
Details
       

 10-29-2014
5.00
Match drill rear skirts to canopy
Details
     

 10-28-2014
4.00
Bend and twist rear skirts to Canopy and Fuselage
Details
     

 10-27-2014
4.00
Final Fit Right and Left Canopy Skirts
Details
       

 10-27-2014
1.00
Final drill and counter sink left side of canopy
Details

 10-22-2014
5.00
Finish drill left Canopy skirts, brace
Details
     

 10-21-2014
4.00
Match drill right left canopy skirts
Details
     

 10-15-2014
1.00
Final drill and counter sink right side of canopy
Details
     

 10-14-2014
5.00
Finish drill right Canopy skirts, brace
Details
     

 10-14-2014
0.50
Drill Lightning holes in wing tip ribs
Details
     

 10-07-2014
4.00
Match drill right side canopy skirts
Details
       

 10-06-2014
4.00
Match drill skirt braces to canopy frame
Details
     

 10-02-2014
2.00
Fabricate Right Canopy skirt Brace
Details

 09-30-2014
4.00
Fit Right Wingtip
Details
     

 09-29-2014
3.00
Fabricate Left Canopy Skirt Brace
Details
     

 09-23-2014
5.00
Fabricate and install canopy anchor blocks.
Details
       

 09-17-2014
3.00
Attach canopy pin mounts to longerons
Details
       

 09-16-2014
1.00
Countersink lower Rudder fairing
Details
     

 09-15-2014
3.00
Dimple and rivet HS, VS and HS tips
Details

 09-10-2014
4.00
Assemble and adjust canopy latch
Details
       

 09-09-2014
4.00
Cut and fit bottom Rudder tip
Details
     

 08-28-2014
3.00
Pre attach holes from wind screen to roll bar
Details

 08-26-2014
3.00
Canopy slider gap
Details
       

 08-21-2014
4.00
Initial Fit of Wind Screen
Details
       

 08-14-2014
2.50
Countersink canopy holes #30
Details

 08-13-2014
1.00
Finished edge on wind screen to prevent cracking d
Details

 08-13-2014
2.00
Drill and dimple left Elevator tip
Details

 08-12-2014
3.00
Drill and Dimple Rudder and Verical Stab tips
Details
     

 08-11-2014
1.00
Epoxy ribs for Horizontal and Vertical Stab tips
Details
       

 08-11-2014
2.00
Debur Canopy and Frame, Drill frame to #30
Details
     

 08-06-2014
4.00
Adjust canopy frame for spring of canopy
Details
       

 08-05-2014
3.00
Fit right horizontal stab tip and left elevator ti
Details
       

 08-04-2014
3.00
Uncleco Canopy from Frame
Details
       

 08-01-2014
1.50
Cut Rear of Canopy
Details
     

 07-10-2014
2.50
Cut and debur side and back Canopy skits
Details
       

 07-08-2014
5.00
Cut bottom of Canopy and Drill and Cleco to frame
Details
       

 07-03-2014
2.00
Clamp back half of Canopy to frame
Details
       

 07-01-2014
2.00
Fabricate and epoxy Vertical Stab rib
Details
     

 06-30-2014
3.00
Fabricate Horizontal Stab tip ribs
Details
       

 06-30-2014
2.00
Canopy handle hole crack
Details
       

 06-26-2014
4.00
Split Canopy
Details
       

 06-24-2014
3.00
Cut and fit Right Elevator Tip
Details
     

 06-23-2014
2.00
Cut Horizontal Stab and Vertical Stab Tips to size
Details
     

 05-30-2014
3.00
Adjusted canopy frame to follow curve of canopy
Details
       

 05-29-2014
5.00
Continue to cut and fit Canopy to frame
Details
       

 05-27-2014
4.00
Cut Molding flanges off of Canopy
Details
       

 05-23-2014
3.00
Started laying out Plexiglass canopy
Details
       

 05-20-2014
5.00
Complete Canopy rear and side track installation.
Details
       

 05-14-2014
3.00
Canopy Track Support
Details
     

 05-12-2014
5.00
Continued fitting Canopy frame to fuselage
Details
       

 05-01-2014
2.00
Start initial fit of Canopy Frame
Details
       

 05-01-2014
1.50
Drill, Countersink and fit Empanage Fairing
Details
     

 04-28-2014
3.00
Rivited Slider Canopy Track and Rail Togeather
Details
       

 04-17-2014
3.00
Start fabrication of Canopy slider track
Details
       

 04-16-2014
3.00
Match drill Canopy Slider block to Frame
Details
     

 04-14-2014
1.50
Cut Canopy Tracks
Details
       

 04-14-2014
1.00
Assemble Roller Assembly for Canopy
Details
       

 04-09-2014
3.00
Complete Bolt in of Roll Bar Brace
Details
       

 04-08-2014
3.00
Roll Bar Brace Match Drill to Roll Bar / Fwd Fusal
Details
       

 04-07-2014
3.00
Initial Fit of Roll Bar Brace
Details
       

 03-27-2014
4.00
Rivet Aft Top Skin to Fusalage
Details
     

 03-25-2014
3.00
Finish installing Roll Bar
Details

 03-24-2014
4.00
Trim Roll Bar feet to match aft Canopy Deck
Details
       

 03-17-2014
4.00
Continue Fitting Roll Bar
Details
       

 03-11-2014
4.00
Fit Roll Bar to Fusalage
Details
       

 03-04-2014
2.00
Completed fabricating Roll Bar Spacers
Details
     

 02-24-2014
2.00
Roll Bar Spacers
Details

 02-18-2014
3.00
Started laying out Roll Bar attachment
Details
       

 02-04-2014
3.50
Complete install of platenuts for Emp Fairing
Details

 01-31-2014
2.50
Install platenuts on Vertical Stabilizer edge for
Details
       

 01-29-2014
2.00
Trim Empanage Fairing to fit
Details
       

 01-28-2014
2.00
Shape and attach right empanage gap filler
Details
     

 01-27-2014
2.00
Shape and attach left empanage gap filler
Details
       

 01-27-2014
1.00
Cleco Aft top skin on fusalage for riveting
Details
     

 01-16-2014
3.00
Debur and Dimple / countersink Fuselage top skin
Details
       

 01-09-2014
3.00
Rudder cables to pedals attach
Details
       

 12-20-2013
2.00
Attach Rudder cable clamps to Fuselage
Details
     

 12-13-2013
1.00
Remove Mid Fuselage top skin for access
Details
     

 12-13-2013
2.00
Ran Rudder cables form control horn to pedals
Details
       

 12-12-2013
2.00
Rivet platenuts to center section vertical support
Details
     

 12-11-2013
2.00
Fit flap actuator covers
Details
     

 12-10-2013
1.50
Install cabin floor covers with Clecos
Details
     

 12-09-2013
2.50
Attach Elevator push rod to controls and bell cran
Details
       

 12-06-2013
3.00
Install threaded rod to Elevator control rod
Details
       

 12-05-2013
1.50
Cut and Prime inside of small elevator push rod
Details

 11-22-2013
4.00
Completed Riveting Front Deck Skin
Details
       

 11-18-2013
3.00
Continue Riveting Forward Deck skin
Details

 11-14-2013
2.00
Start riveting front deck skin to structure and fu
Details
     

 11-14-2013
4.00
Final rivet front deck sturcture
Details
       

 11-12-2013
4.00
Fit Vents to Insturment Panel and side of Fusalage
Details
       

 11-11-2013
1.00
Reassemble forward deck structure
Details
     

 11-11-2013
3.00
Fabricate vent brackets
Details
     

 11-07-2013
5.00
Forward Deck dismantle, debur and dimple
Details
       

 11-05-2013
4.00
Fabricate and rivet side brackets for forward deck
Details
       

 11-05-2013
3.00
Debur forward deck flanges and firewall
Details
     

 11-04-2013
3.00
Match Drill forward skin to forward ribs and fire
Details

 10-31-2013
4.00
Fit forward deck skin to structure
Details
     

 10-30-2013
1.50
Debur forward fusalage deck skin
Details
     

 10-29-2013
2.00
Finiish assembling forward fuselage structure
Details

 10-28-2013
4.00
Start assembling forward fuselage structure
Details
     

 10-27-2013
2.50
Rivet forward fusalage center rib
Details
       

 10-25-2013
3.00
Forward Fuselage Center Rib Assembly
Details
       

 10-23-2013
3.00
Fabricate Various Instrument Panel parts
Details
       

 10-22-2013
4.00
Upper Attach Instrument Panel Brackets Fabrication
Details
       

 10-18-2013
3.00
Leak Test Fuel Tank plumbing
Details
       

 10-17-2013
3.00
Rivet Rudder Stops to Fusalage
Details
       

 10-16-2013
4.00
Adjust stops to allow for 35 degree deflection
Details
       

 10-15-2013
4.00
Fabricate Rudder Stops
Details
       

 10-14-2013
5.00
Mount Rudder
Details
     

 10-08-2013
2.50
Set Elevator Up Stop
Details
       

 10-08-2013
2.50
Mount Empanage on Fusalage
Details
       

 10-07-2013
3.00
Match Drill and tap Emp Cover and Access Plates
Details
       

 10-03-2013
3.00
Fit Aft Side Skin to Aft Deck and Emp Gap Cover
Details
       

 10-01-2013
4.00
Remove Empanage and Debur
Details
       

 09-28-2013
4.00
Match drill and bolt Vertical Stab to Fus and HS
Details
       

 09-27-2013
4.00
Elevator stop fabrication and fitting
Details
       

 09-26-2013
1.00
Match drill attach plate to Vertical Stab
Details
     

 09-25-2013
2.00
Measure Vertical Stab from Horizontal Stab
Details
     

 09-24-2013
1.50
Prime Elavator Push Rod on outside
Details
     

 09-24-2013
2.50
Fit Vertical Stabilizer
Details
       

 09-18-2013
3.00
Drill and rivet Elevator Push rod ends
Details
     

 09-17-2013
1.50
Cut and prime inside of elevator push rod
Details
       

 09-16-2013
4.00
Set Elevator down Deflection
Details
       

 09-10-2013
3.00
Match drill and bolt Horizontal Stabilizer to Fuse
Details
       

 09-09-2013
1.50
Fabricate shims to for Horizontal Stabilizer
Details
     

 09-09-2013
3.00
Clamp Horizontal Stabilizer on Fuselage
Details
       

 09-08-2013
2.00
Fit Horizontal Stabilizer to Fuselage
Details
       

 09-08-2013
0.00
Fit Horizontal Stabilizer to Fuselage
Details
       

 09-04-2013
2.00
Drill Elevator horn
Details
       

 09-03-2013
2.00
EAA Technical Counselor visit
Details
     

 08-29-2013
3.00
Elevator Horns guide hole for control tube
Details
       

 08-28-2013
0.50
Ran flex brake lines between firewall and pedals
Details
       

 08-28-2013
1.00
Provide isolation between fuel and brake lines
Details
     

 08-27-2013
3.00
Run brake lines from Fuselage floor to Fire wall
Details
       

 08-26-2013
4.00
Run Fuel line from valve to electric Fuel pump
Details
       

 08-26-2013
2.00
Ran overhead break lines from right to left pedals
Details
       

 08-23-2013
2.50
Break Fluid Reservoir and Right Pedals
Details
       

 08-22-2013
3.00
Break line fittings from inside to outside of fusa
Details
       

 08-19-2013
2.00
Rivet Fire Wall to side and bottom fusalage skins
Details
     

 08-15-2013
2.00
Route right fuel line and attach to Tank and Valve
Details
       

 08-13-2013
2.30
Route left fule line and attach to Tank and Valve
Details
       

 08-13-2013
1.50
Assemble Fuel Valve to Attach Plate
Details
       

 08-10-2013
2.00
Complete Fuel Vent Lines
Details
       

 07-26-2013
2.50
Cut holes in fuselage for fuel lines and vents
Details
       

 07-23-2013
3.00
Fuel Vent Plumbing
Details
       

 07-22-2013
5.00
Fuel Vent Plumbing
Details
       

 07-19-2013
3.00
Attach right Aileron push rod to control sticks
Details
     

 07-18-2013
3.00
Attach left Aileron push rod to control sticks
Details
     

 07-09-2013
4.00
Install Control Colum, Sticks and Push Rods
Details
     

 07-06-2013
4.00
Install right Flap and attach to Actuator
Details
       

 07-05-2013
5.00
Install left Flap and attach to Actuator
Details
       

 06-27-2013
3.00
Complete Left Tank Attach to Fuselage and Wing Att
Details
     

 06-25-2013
3.00
Complete Right Tank Attach to Fuselage and Wing
Details
     

 06-24-2013
3.00
Right Tank Attach
Details
       

 06-21-2013
3.00
Fabricate Tank Attack Brackets
Details
     

 06-12-2013
4.00
Install Lower Wing Sking to Fuselage Screws
Details
       

 06-10-2013
1.50
Check Wing Sweep
Details
       

 06-10-2013
1.50
Check Wing Plumb
Details
       

 06-10-2013
2.00
Check Wing Incidence
Details
       

 06-10-2013
1.00
Bolt left rear wing spar to Fuselage
Details
     

 06-07-2013
3.00
Tighen wing bolts
Details
       

 06-05-2013
5.00
Attach Wings to Fuselage
Details
       

 05-31-2013
6.00
Install Landing Gear Mounts
Details
       

 05-29-2013
3.00
Fit landing grear brackets to center bulkhead
Details
       

 05-24-2013
2.00
Match Drill land Gear mount to Landing gear
Details

 05-21-2013
4.00
Electric Flap Actuator Installation
Details
       

 05-20-2013
0.00
Fuselage Stand
       

 05-20-2013
5.00
Fit Flap Actuator Channel
Details
       

 05-20-2013
0.00

       

 05-15-2013
4.00
Fabricate more electric flap hardware
Details
       

 05-13-2013
3.00
Fabricate electric flap hardware
Details
       

 05-06-2013
5.00
Install flap actuator
Details
       

 05-03-2013
1.00
Drill electric actuator for safety wire
Details
       

 04-30-2013
2.00
Finished center cabin cover
Details

 04-29-2013
2.00
Fuel Valve Plate & Cover, and Center cabin cover
Details
       

 04-25-2013
4.00
Rivet Heat Baffle to Center Cabin Cover
Details
       

 04-24-2013
4.00
Rivet left seat back
Details
       

 04-22-2013
3.00
Riveted right seat back
Details
     

 04-19-2013
3.00
Disassemble, deburr and reassemble right seat bac
Details
       

 04-18-2013
4.00
Fabricated right seat back
Details
       

 04-11-2013
4.00
Fabricated left seat back
Details
       

 04-10-2013
3.00
Layed out Seat Back rivet holes
Details
     

 04-09-2013
3.00
Deburred Seat Back Support and Lightning holes
Details
     

 03-29-2013
5.00
Fabricate Seat Back Support Brackets
Details
       

 03-25-2013
1.00
Rivet Seat Floor Tunnel platenuts
Details
     

 03-25-2013
3.00
Cut tunnel cover brackets form Z stock
Details
       

 03-21-2013
3.00
Seat Floors - Drilled, Deburred and Riveted
Details
       

 03-20-2013
3.00
Baggage area covers
Details
       

 03-19-2013
3.00
Install harness cable wear blocks
Details
       

 03-18-2013
3.00
Rivet Baggage Floors to Ribs and Bukhead
Details
       

 03-14-2013
2.00
Fit and cleco Bagage floors onto ribs
Details
     

 03-13-2013
0.10
EAA Technical Counselor Inspection
Details
     

 03-13-2013
3.00
Bolted and Riveted Steps to Fuselage
Details
       

 03-12-2013
2.00
Remove steps and debur fuselage skins
Details
     

 03-12-2013
1.50
Prime Steps
Details
       

 03-11-2013
3.00
Fit left step to Fuselage.
Details
       

 03-07-2013
3.00
Fab baggage bulkhead wear blocks and washers
Details

 03-05-2013
4.00
Fit right step to Fuselage.
Details
       

 03-04-2013
2.00
Step Installation - Drill out aft bagages covers
Details
     

 02-25-2013
4.00
Drill in Rib stiffeners to aft top Skins
Details
       

 02-20-2013
2.00
Cleco Aft top skin to Bulkheads and Longerons
Details
     

 02-19-2013
2.00
Debur and prep Aft Top Skin
Details
     

 02-18-2013
3.00
Fix QB angle clip for F-787 Web Stiffener
Details
       

 02-14-2013
4.00
Fabricate and install Elevator Bellcrank
Details
       

 02-12-2013
4.00
Rivet mid fuselage gussets
Details
       

 02-11-2013
4.00
Trim mid fuselage gussets for slider
Details
       

 02-04-2013
4.00
Cut and install Rudder Pedal Brace
Details
     

 01-28-2013
5.00
Build rudder pedal assembly
Details
     

 01-17-2013
4.00
Fabricate various Rudder control parts
Details
       

 01-16-2013
3.00
Completed Rudder Pedals
Details
       

 01-15-2013
3.00
Deburr and dimple Rudder pedal parts
Details
       

 01-14-2013
3.00
Cut Rudder pedals per plans
Details
       

 01-10-2013
4.00
Started fabricating Rudder pedals
Details
       

 01-08-2013
3.00
Cut holes in lower skin for Main gears
Details
       

 12-31-2012
1.50
Drill step holes in side skins
Details
     

 12-31-2012
1.50
Cleco firewall, longeron, and corner brackets to s
Details
     

 12-28-2012
3.00
Cut Step holes in Baggage Ribs
Details
     

 12-27-2012
1.50
Tap Seat Rib Nutplates
Details

 12-26-2012
3.00
Continued to verify plans to Quick Build Fuselage
Details

 12-21-2012
4.00
Rear Bulkhead
Details
       

 12-20-2012
1.50
Prime Rear tie down bracket
Details
     

 12-19-2012
3.50
Fabricate rear tie down bracket
Details
       

 12-18-2012
4.00
Removed aft Bulkhead from Fuselage
Details
       

 12-17-2012
4.00
Verify Quick Build Fuselage against plans
Details

 12-13-2012
1.50
Rivet right upper bulkhead
Details
     

 12-13-2012
2.00
Drill and fit Flap bearing blocks
Details
     

 12-11-2012
1.50
Rivet left upper bulkhead
Details
     

 12-11-2012
2.00
Bolt Control column to bulkhead
Details
     

 12-10-2012
1.50
Rivet Seat support Brackets to Mid Bulkhead
       

 12-10-2012
2.50
Cut and double inside seat back ribs
Details
     

 12-07-2012
4.00
Drill, deburr and dimple seat supports
Details
     

 12-06-2012
3.00
Fabricated seat back brackets and shims
     

 12-04-2012
3.00
Removed QB inner floor and cargo covers
Details
       

 12-03-2012
3.00
Drilled out Inner seat ribs for Control Arm Access
Details
     

 11-29-2012
2.00
Rivet Break line bracket to firewall
Details
     

 11-27-2012
2.50
Riveted Aux Fuel pump doubler to Firewall
Details
     

 11-26-2012
5.00
Fabricate Aux Fuel Pump Doubler and drill firewall
Details
       

 11-26-2012
1.00
Cleco / Match Drill Firewall Recess
Details
     

 11-26-2012
1.00
Cleco / Match Drill Brake line bracket to Firewall
Details
     

 11-19-2012
5.00
Riveted Left lower wing skin
Details
       

 11-16-2012
2.00
Started riveting right lower skin to wing
Details
     

 11-16-2012
0.50
Ok to Close from EAA Technical Councelor
Details
     

 11-16-2012
5.00
Closed Right Wing
Details
     

 11-13-2012
2.00
Riveted access plates nut plates to lower wing ski
Details
       

 11-12-2012
2.00
Prime inside of lower wing skins
Details
       

 11-12-2012
1.00
Drill and dimple access covers for lower wing skin
Details
     

 11-11-2012
1.50
Dimpled rib holes in lower wing skins
Details
     

 11-09-2012
2.00
Dimpled right and left bottom wing skins
Details
       

 11-08-2012
2.00
Dimple right wing ribs / Countersink rear spar
Details
       

 10-26-2012
4.00
Cleco match drill and deburr right bottom skin
Details
     

 10-25-2012
1.50
Dimple left wing ribs / Countersink rear spar
Details
       

 10-23-2012
3.00
Completed installation of stall warner
Details
       

 10-22-2012
2.50
Match drill left wing bottom skin, spar and ribs
       

 10-22-2012
2.50
Assemble Stall warning sensor
Details
     

 10-19-2012
3.00
Fit bottom skint to Left Wing
Details
     

 10-17-2012
2.00
Cut slot in leading edge for stall warner
Details
     

 10-16-2012
4.00
Stall Warner doubler
Details
       

 10-15-2012
3.00
Ran conduit in right wing for lights and autopilot
Details
       

 10-13-2012
3.00
Ran conduits in left wing for lights and autopilot
Details
       

 10-11-2012
4.00
Pitot Tube
Details
       

 10-10-2012
3.00
Attach Flaps to wings
Details
       

 10-08-2012
5.00
Attach Ailerons to Wings
Details
       

 10-05-2012
2.00
Primed Aileron push rods
Details
     

 10-04-2012
1.50
Riveted rod ends to Aileron push rod
Details
       

 10-03-2012
1.50
Primed inside of W-917 Aileron push rod
Details

 10-03-2012
2.00
Install Aileron bell cranks
Details
       

 10-01-2012
2.00
Match drilled Aileron push rod ends
Details
     

 09-28-2012
1.00
Weld W-917 Aileron push rod threaded ends
Details
       

 09-27-2012
4.00
Cut and Fit Aileron push rods (W-917 & W-918)
Details
     

 09-25-2012
3.00
Drill and attache Aileron hinge brackets
Details
       

 09-24-2012
3.00
Cut and install landing light lens
     

 09-18-2012
5.00
Cleco, match drill, dimple, rivet Aileron fairings
Details
       

 09-17-2012
2.00
Rivet Flap gap fairings to wings
Details
       

 09-14-2012
2.00
Rivet right Flap fairing to rear spar and upper sk
Details
       

 09-14-2012
1.50
Dimple upper Wing skins for Flap fairing
Details
       

 09-14-2012
1.00
Dimple Flap fairings

 09-14-2012
1.00
Cleco left and right Flap fairing to wings
Details
     

 09-13-2012
1.00
Match drill flap fairings
Details

 09-13-2012
1.00
Install assembled landing ling assembly in wing
Details
     

 09-12-2012
2.00
Modify landing light brack and install balast and
Details
       

 09-10-2012
2.50
Drill and rivet Landing Light brackets Plate Nuts
Details
       

 08-23-2012
1.50
Fit and drill Landing Light retainer strips
Details
     

 08-23-2012
2.00
Deburr and cleco Flap gap fairings to Wings
Details
       

 08-22-2012
3.00
Cut hole in left Wing for landing light
Details
       

 08-21-2012
2.00
Pressure test fuel tanks
Details
       

 08-15-2012
2.50
Seal Fuel Tank Access Plate
Details
       

 08-13-2012
3.00
Riveted Aileron brackers to rear wing spars
Details
       

 08-10-2012
1.00
Cleco Aileron Brackets to rear Wing spars
       

 08-09-2012
4.00
Fabricated Aileron brackets
Details
       

 08-07-2012
3.00
Bend fuel sender floats and test
Details
       

 08-06-2012
3.00
Tie down Rings
Details
     

 08-03-2012
1.50
Seal fuel level sendier to cover plate
Details
       

 08-03-2012
2.00
Fuel Tank Z brackets
Details
       

 08-02-2012
2.50
Fuel pickup Tiubes
Details
       

 07-26-2012
3.00
Mounted Wings on Stand
Details
       

 07-25-2012
4.00
Constructed Wing Stands
Details
       

 07-24-2012
3.00
Unpack Quick Build Wings
Details
       

 07-23-2012
40.00
Moved Shop
Details
       

 07-02-2012
2.00
Attach Elevators to Horizontal Stabilizer
Details
     

 06-29-2012
3.00
Fit right Elevator to Horizontal Stabilizer
Details
       

 06-26-2012
2.00
Fabricate and install pigtail on Trim Tab Servo
Details
       

 06-25-2012
4.00
Attach Elevator trim tab to left Elevator
Details
       

 06-22-2012
2.00
Riveted electronic Trim Tab servo brackets
Details
       

 06-20-2012
4.00
Cut and bolt counter balance weights for Elevator
Details
       

 06-18-2012
1.00
Rivet spar and hinge to Elevator Trim Tab
Details
     

 06-18-2012
2.00
Complete left Elevator trailing edge
Details
       

 06-15-2012
1.00
Primed Trim Tab spar
Details
     

 06-15-2012
1.50
Drill AEX wedge for left Elevator
Details
     

 06-15-2012
0.50
Adhere foam ribs into Trim tab
Details
       

 06-15-2012
0.50
Adhere AEX wedge into left Elevator trailing edge
Details
     

 06-13-2012
2.00
Drill in hinge for Elevator Trim Tab and cut to si
Details
       

 06-13-2012
1.00
Closed left Elevator
Details
       

 06-12-2012
1.50
Primed inside of Elevator Trim Tab
Details
     

 06-12-2012
3.00
Elevator Trim Tab Skin
Details
       

 06-12-2012
1.00
Cut Elevator Trim Tab horns for electric Trim
Details
       

 06-11-2012
1.00
Scuff Elevator trim tab for foam ribs and priming
Details
     

 06-10-2012
1.50
Cut out foam ribs for Elevator trim tab
Details
       

 06-10-2012
1.50
Bend Elevator trim tab edges
Details
       

 06-07-2012
2.00
Fabricated and rivited left Elevator gusset
Details
     

 06-01-2012
1.50
Rivet left Elevator horn to spar and root rib
Details
       

 06-01-2012
2.00
Attach left Elevator spar and counter balance
Details
       

 05-31-2012
1.00
Riveted left counter balance skin to ribs
Details
     

 05-31-2012
1.50
Riveted hinge reinforcement plates to spar
Details
       

 05-29-2012
2.00
Riveted top left Elevator stiffners to skin
Details
     

 05-28-2012
2.00
Primed left Elevator skin, spar and ribs
Details
       

 05-18-2012
2.00
Rivet right elevator trailing edge
Details
       

 05-18-2012
1.00
Rivet right elevator counter balance rib and rib
Details
     

 05-18-2012
3.00
Dimple left Elevator spar, ribs and trim spar
Details
       

 05-17-2012
3.00
Deburr and dimple left Elevator skin and spar
Details
       

 05-15-2012
1.50
Bond trailing edige of right Elevator
Details
     

 05-14-2012
2.50
Drill, dimple and counter sink right elevator edge
Details
       

 05-11-2012
5.00
Riveted right Elevator togeather
Details
     

 05-11-2012
1.00
OK to close right Elevator
Details
       

 05-10-2012
1.00
Primed right Elevator spar, root rib, reinf plates
Details
     

 05-10-2012
2.00
Cleco left Elevator spars, skins, ribs
Details
     

 05-09-2012
2.00
Riveted stiffners to inside of right Elevator skin
Details
     

 05-08-2012
1.50
Primed inside of right elevator skin
Details
     

 05-07-2012
2.00
Rolled and joined leading edge of Rudder
Details
       

 05-07-2012
2.00
Bonded AEX wedge to trailing edge of Rudder
Details
     

 05-04-2012
1.50
Bonded AEX wedge to trailing edge of Rudder
Details

 05-03-2012
4.00
Match drill, deburr & dimple right Elevator
Details
       

 05-03-2012
1.00
Cleco left Elevator spar and skin
Details
     

 05-02-2012
4.00
Cleco right Elevator spar, skin, ribs, and ctr bal
Details
       

 05-01-2012
2.00
Match drill angle to Rudder leading edge
Details
     

 04-26-2012
4.00
Rivet Rudder skin to ribs and spar
Details
       

 04-25-2012
1.00
Ok to close
Details
       

 04-24-2012
2.00
Cleco Rudder skin to spar and ribs
Details
       

 04-23-2012
3.00
Install Rudder counter balance skin and weight
Details
     

 04-22-2012
3.00
Primed Elevator and Rudder parts
Details
     

 04-18-2012
3.00
Deburr and Dimple Elevator Tips and Skins
Details
     

 04-16-2012
3.00
Elevator Tips
Details
     

 04-15-2012
3.00
Dimple left Elevator skin and stiffners
Details
       

 04-13-2012
3.00
Match drill left Elevator skin and stiffeners
Details

 04-11-2012
4.00
Deburr and Dimple right Elevator skin and stiffene
Details
       

 04-10-2012
4.00
Match drill right Elevator sking and stiffeners
Details
     

 04-05-2012
5.00
Rivited Rudder spars and ribs
Details
       

 04-04-2012
1.50
Prime Rudder spar, ribs, horn, brace, attach strip
Details
     

 04-04-2012
2.50
Cut out and deburr Elevator stiffners
Details
     

 04-02-2012
7.00
Deburr and dimple Rudder skins, spar and ribs
Details
       

 04-01-2012
2.50
Fabricate and attach Rudder brace and attach strip
Details
       

 03-31-2012
3.00
Cleco Rudder skins to spars and ribs and match dri
Details
       

 03-30-2012
2.00
Started assembly of rudder skeleton
       

 03-30-2012
2.00
Rivet right Rudder stiffeners to skin
Details
     

 03-29-2012
2.00
Rivet left Rudder stiffeners to skin
Details
       

 03-27-2012
2.00
Prime inside of Rudder skins and stiffeners
Details
       

 03-26-2012
2.50
Dimple Rudder skins and stiffeners
Details
       

 03-26-2012
1.00
Deburr Rudder skins
Details

 03-24-2012
1.50
Deburr Rudder Stiffners
Details

 03-23-2012
2.00
Match Drill and Cleco left Rudder Stiffeners
Details
     

 03-23-2012
2.00
Close Vertical Stabilizer
Details
       

 03-22-2012
1.00
Vertical Stablizer OK to Close
Details
       

 03-21-2012
2.50
Match Dril and Cleco right Rudder Stiffeners
Details
     

 03-20-2012
2.50
Cut Stiffeners for Rudder
Details
     

 03-19-2012
3.00
Rivet Vertical Stabilizer skin to Fwrd Spar and Ri
Details
       

 03-17-2012
3.00
Rivet Vertical Stabilizer Spars, Doubler, and Ribs
Details
       

 03-02-2012
1.50
Primed Vertical Stabilzer Skin, Ribs, and Spars
Details
       

 03-01-2012
1.50
Degreased Vertical Stabilizer Skin, Spars, Ribs
Details

 02-29-2012
3.00
Dimple Vertical Stabilizer
Details
       

 02-28-2012
4.00
Match Drill Vertical Stabilizer Skin
Details

 02-27-2012
3.00
Cleco'd Vertical Stabilizer Skin to Spars and Ribs
Details
       

 02-26-2012
2.00
Vertical Stabilizer
Details
       

 02-23-2012
3.00
Rivited Horizontal Stablizer Rear Spar to Right Sk
Details
       

 02-22-2012
2.00
Rivited Horizontal Stablizer Rear Spar to Left Ski
Details
       

 02-20-2012
1.50
Riveted Left Horizontal mid Ribs to skin
Details
     

 02-20-2012
1.00
Received OK to close
Details
     

 02-20-2012
3.00
Close Horizontal Stabilizer Nose and Mid Ribs and
Details
       

 02-19-2012
2.00
Riveted Left Horizontal Stabilizer Skin to nose Ri
Details

 02-16-2012
2.00
Riveted Right Horizontal Stabilizer Skin to Mid Ri
Details
       

 02-15-2012
2.00
Riveted Right Horizontal Stabilizer Skin to Front
Details
       

 02-13-2012
1.50
Riveted Right Horizontal Stablizer Nose Ribs to sk
Details

 02-12-2012
3.00
Rivet Horizontal Spars Togeather
Details
       

 02-11-2012
2.00
Primed Horizontal Stabilizer
Details
       

 02-10-2012
1.50
Degreased Horizontal Stabilizer Parts for priming
Details

 02-09-2012
2.00
Complete Spray Booth
Details
     

 02-07-2012
2.00
EAA Technical Counselar Visit
Details
       

 02-06-2012
5.00
Built Paint Spray Booth Frame
Details

 02-03-2012
1.50
Dimple center of L Horizontal Stabilzer Skin
Details
     

 02-02-2012
1.50
Dimple center of R Horizontal Stabilzer Skin
Details
     

 02-01-2012
1.50
Dimple L & R Horizontal Stabilizer Skin edges
Details

 01-31-2012
1.00
Dimple Horizontal Stabilizer Main and Nose Ribs
Details
     

 01-31-2012
2.00
Counter Sink Spar flanges
Details
       

 01-30-2012
2.00
Left Side Horizontal Stabilizer Interior Assembly
Details

 01-30-2012
2.00
Left Horizontal Stabilizer Interior Assembly Cont
Details

 01-30-2012
2.00
Deburr all Horizontal Stalbilizer Parts
Details

 01-29-2012
2.00
Right Horizontal Stablizer Interior Assembly - Con
Details

 01-27-2012
2.00
Right Horizontal Stabilizer Interior Assembly
Details
       

 01-26-2012
2.00
Cut out and set up Jig Cradle Blocks
Details
     

 01-24-2012
1.50
Cleco front Horizontal Stabilizer spar to ribs
Details
     

 01-22-2012
1.00
Cleco Rear Horizontal Spar to Ribs
Details
     

 01-20-2012
1.00
Fabricated HS909 shims
Details
     

 01-19-2012
2.00
Deburr Horizontal Stabilizer main and nose ribs
Details

 01-18-2012
2.00
Cleco together reart horizontal stabilizer spar
Details
     

 01-17-2012
4.00
Front spar - horizontal stabilizer
Details
     

 01-16-2012
3.00
EAA Technical Counselor Visit
Details
       

 01-15-2012
3.00
Inventory Wing and fuselage
Details
       

 01-14-2012
3.00
Inventroy empennage
Details
       

 01-12-2012
3.00
Receive Kit
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.