Powered By Kitlog Pro v2.0
Neils Web Site
RV9A
Fuselage
7-9-2013
< Previous Log Entry
Next Log Entry >
Date:
7-9-2013
Number of Hours:
4.00
Manual Reference:
8
Brief Description:
Install Control Colum, Sticks and Push Rods
Install Control Colum, Sticks and Push Rods
Open floor riibs and remove control column
Bolt control sticks and bush rods to control column. The little 5702-75-60 were very difficult to install and after adjustment reinstall.
Adjust push rod to make control sticks even. This required installing assembly, adjusting, removing and adjusting push rod and reinstalling.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
EX-3 Home
RV9A Home
Category
# Logs
# Hours
All
853
3355
Avionics
106
456
DAR and Technical Co
6
12
Delivery & Invenory
3
23
Empennage
121
306
Engine
22
82
Finish
186
758
Firewall Forward
139
508
Fuselage
178
700
Miscellaneous
3
10
None
2
40
Wings
87
460
Copyright © 2001-2024 Matronics. All Rights Reserved.