Powered By Kitlog Pro v2.0
Neils Web Site
RV9A
Avionics
12-7-2017
< Previous Log Entry
Next Log Entry >
Date:
12-7-2017
Number of Hours:
4.00
Manual Reference:
Brief Description:
Antenna Pre Installation
Antenna Pre Installation
Layed out position of GPS (G3X and GTN650), VHF1&2 (G3X and GTN650) , XM, and Transponder Antennas (for both ADSB in and out).
VOR will either be in right wing or in Vertical Stab
Enlarged cable runs for coax cables.
Ordered missing anttennas for VHF and ADSB in, which will be on bottom of plane.
Ordered tools for stripping and crimping antenna connectors.
G3X manual and GTN manual had plans for antenna doublers, Stein will either order premade ones from Garmin or cut them on their C&C machine.
.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
EX-3 Home
RV9A Home
Category
# Logs
# Hours
All
853
3363
Avionics
106
456
DAR and Technical Co
6
12
Delivery & Invenory
3
23
Empennage
121
306
Engine
22
82
Finish
186
765
Firewall Forward
139
509
Fuselage
178
700
Miscellaneous
3
10
None
2
40
Wings
87
460
Copyright © 2001-2024 Matronics. All Rights Reserved.