Powered By Kitlog Pro v2.0
Neils Web Site
RV9A
Avionics
11-2-2017
< Previous Log Entry
Next Log Entry >
Date:
11-2-2017
Number of Hours:
3.00
Manual Reference:
Brief Description:
Install Pitot Heat breaker and switch
Install Pitot Heat breaker and switch.
Wired breaker to bus bar.
Ran 10 ga wire to switch.
Wired pitot heat wire to switch.
Veirfied voltage.
Ordered label machine and tape to match panel.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
EX-3 Home
RV9A Home
Category
# Logs
# Hours
All
853
3363
Avionics
106
456
DAR and Technical Co
6
12
Delivery & Invenory
3
23
Empennage
121
306
Engine
22
82
Finish
186
765
Firewall Forward
139
509
Fuselage
178
700
Miscellaneous
3
10
None
2
40
Wings
87
460
Copyright © 2001-2024 Matronics. All Rights Reserved.