Powered By Kitlog Pro v2.0
Neils Web Site
RV9A
Avionics
10-27-2017
< Previous Log Entry
Next Log Entry >
Date:
10-27-2017
Number of Hours:
4.00
Manual Reference:
Brief Description:
Final fit of Autopilot Pitch Servo
Final fit of Autopilot Pitch Servo
Adjust push rods to allow clearance to servo stops and make sure manual elevator controls are not interfered with.
Drill servo mounting bracket to support structures. Disassemble servo, servo bracket, push rods, and bell crank and debur.
Reassemble bell crank and control rods,
Cleco and rivet servo bracket to support structure
Install servo onto bracket and attach connecting rod to bell crank.
Verify operation of bell crank, elevator, and servo.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
EX-3 Home
RV9A Home
Category
# Logs
# Hours
All
853
3363
Avionics
106
456
DAR and Technical Co
6
12
Delivery & Invenory
3
23
Empennage
121
306
Engine
22
82
Finish
186
765
Firewall Forward
139
509
Fuselage
178
700
Miscellaneous
3
10
None
2
40
Wings
87
460
Copyright © 2001-2024 Matronics. All Rights Reserved.