In order to trial fit these pieces, the nose wheel had to be off the ground. Used 3 sacks of cement and a strap to the tail tiedown ring, to lift the nose wheel off. Using the preformed Fairings - Etc fairing piece, made several trim cuts to optimize the fit around the strut and to the pant nose section. Match drilled to nose cone, then floxed the piece to the nose cone. Added microballoons around the edge to create a flared edge.