KitLog pro

Powered By Kitlog Pro v2.0

Mikes RV-9A Web Site
' style=
Date:  10-10-2009
Number of Hours:  2.00
Manual Reference:  
Brief Description:  EGT/CHT probes. Fuel line re-route.

Dilled EGT probe holes at 2" from exhaust flange on all four pipes. Installed CHT/EGT probes on all 4 cylinders and bundled wiring. Right side (Cyl 1 & 3) are ready to make connections and hook up.

As routing space closes in, it became apparent the fuel line from the mechanical pump to the FI injector body needed to be rerouted. Tried several "paths" and settled on final routing. Secured fuel line for final time.
' style=

EGT/CHT probe leads, bundled

EGT/CHT probe leads, bundled

' style=

EGT/CHT probes ready for termination to engine monitor harness.

EGT/CHT probes ready for termination to engine monitor harness.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.