KitLog pro

Powered By Kitlog Pro v2.0

Mikes RV-9A Web Site
' style=
Date:  12-28-2008
Number of Hours:  4.00
Manual Reference:  
Brief Description:  More wiring

Installed the Aux fuel tank LI in panel. Added second dimmer pot and controller. Swapped 2 circuit breakers around on busses to accomodate size changes from previous drawing updates.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.