KitLog pro

Powered By Kitlog Pro v2.0

Mikes RV-9A Web Site
' style=
Date:  4-20-2008
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Fuel tank bracket drilling, misc.

Using a vice and a big mallet, was able to bend the angle to match the wing to fuselage curvature. Then matchdrilled to fuselage and to the fuel tank bracket. This is tedious in ensuring alignments and blind drilling from inside the fuselage into the bracket flange foot. But it came out good.

Also set nose gear kickout force of 22 lbs. then drilled the cotter pin holes in the axel.
' style=

Rear spar matchdrilled

Rear spar matchdrilled

' style=

Front tank bracket bent to fit.

Front tank bracket bent to fit.

' style=

Then matched drilled

Then matched drilled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.