Brief Description: Securing Nav antennas in wing tip
Sanded inside of wing tips with 30 grit paper where antennas will lay, then using 60 min epoxy, glued antennas down about every 6". Using drop cord light inside tip, identified rib location on exterior surface for pop riveting after rib is floxed into place.
VOR & Marker beacon antennas epoxied in place with duct tape holding.
Spanwise rib location identified using light inside tip