Completed following tasks:Back riveted Rt Elevator trailing edge.Mounted and riveted trim tab to Lt. Elevator.Match drilled each elevator control horn to Horiz Stab bearing point.Mounted both elevators to HSMounted elevator counter balance weights.
Match drilling elevator horn to Horiz Stab bearing