KitLog pro

Powered By Kitlog Pro v2.0

Dan's Web Site
' style=
Date:  2-25-2009
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Install Parts 4,5&6, Clamp and Drill 5&6 Together

Now that part 6 can be fully secured to the engine block via part 15 along with the spacer for the mounting bolt, I clamped and marked the flanges of parts 5 and 6 together and used a right-angle drill to drill 4 alignment holes while the assembly was on the engine. Then I removed everything and drilled the remaining holes.
' style=

Parts 4,5&6 installed on engine, clamped together, & 4 alignment holes drilled with right-angle drill

Parts 4,5&6 installed on engine, clamped together, & 4 alignment holes drilled with right-angle drill

' style=

Part 6 drilled to parts 4&5

Part 6 drilled to parts 4&5

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.