KitLog pro

Powered By Kitlog Pro v2.0

Dan's Web Site
' style=
Date:  2-24-2009
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Bend, Drill, Debur, Alodine, Install Part 15

Today I worked on part 15, the aft support bracket that is used to bolt parts 6&7 together and secure them to the engine block. I had to adjust the bends in part 15 so it would align with both the engine block as well as with the aft baffles. I also had to do a bit of trimming of parts 6&7 around the engine so the lap joint between these baffles would align better.

Once all of the bending and trimming was done I temporarily bolted part 15 to the engine block, then clamped parts 6&7 to each other and to the bracket and then matched drilled these 3 parts together.

Everything was then removed and part 15 deburred, cleaned, alodined, and permanently bolted to the engine block. I torqued these bolts to 96 in-lbs per the Lycoming overhaul manual and placed some torque seal on the bolt heads.
' style=

Part 15 aft support bracket adjusted to align with parts 6&7 and temporariliy bolted to engine

Part 15 aft support bracket adjusted to align with parts 6&7 and temporariliy bolted to engine

' style=

Parts 6&7 drilled and clecoed to part 15 aft support bracket

Parts 6&7 drilled and clecoed to part 15 aft support bracket

' style=

Part 15 permanently installed on engine; Parts 6&7 clecoed to part 15 support bracket

Part 15 permanently installed on engine; Parts 6&7 clecoed to part 15 support bracket

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.