KitLog pro

Powered By Kitlog Pro v2.0

Dan's Web Site
' style=
Date:  1-7-2009
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Temp Install Right Inlet Baffle and Lower Cowl

Once the right inlet baffle components were riveted together I installed the assembly onto the engine along with the lower cowl to double check the alignment between the baffle floor and inlet floor of the cowl. The gap between the two should be between 3/8" and 1/2" and will eventually be sealed with the flexible rubber baffling material. You can see that the gap is a bit larger at the center of the inlet than it is at the sides but this should work out fine.
' style=

Right inlet installed on engine - front view

Right inlet installed on engine - front view

' style=

Right inlet installed on engine - side view

Right inlet installed on engine - side view

' style=

Right inlet installed on engine with lower cowl also in place

Right inlet installed on engine with lower cowl also in place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.