Powered By Kitlog Pro v2.0
Dan's Web Site
RV-7A
Canopy Frame
3-8-2006
< Previous Log Entry
Next Log Entry >
Date:
3-8-2006
Number of Hours:
0.50
Manual Reference:
Brief Description:
Drill Side Skirts to Canopy Frame
Once all of the prep work was done on the side skirts I duct taped them to the canopy and frame. I then drilled the WD-725 canopy side rails using the holes in the C-603 side skirts as a guide.
Left side skirt taped to canopy/frame
Left side skirt drilled to frame
Right side skirt drilled to frame
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
1974
2363
Ailerons
35
56
Assembly
5
6
Avionics
4
4
Baffles
134
110
Big Dig
8
Brakes
23
26
Canopy
64
83
Canopy Frame
144
152
Cowl
68
74
Electrial
120
96
Electrical
120
96
Elevator
58
90
Empennage
30
48
Engine
64
42
Filtered Air Box
26
22
Finish Kit
4
4
Firewall Forward
27
24
Flaps
50
64
Forward Fuselage
44
53
Fuel System
28
36
Fuselage
294
460
Gear
32
38
Hangar
2
Hardware
5
4
Horizontal Stabilizer
42
60
Left Aileron
4
6
Left Flap
3
2
Left Fuel Tank
38
68
Left Wing
90
117
Paint
1
0
Panel
39
47
Photo Shoot
25
2
Prop
4
4
Right Aileron
2
2
Right Flap
3
2
Right Fuel Tank
43
60
Right Wing
84
102
Rudder
16
30
Rudder II
31
54
Seats
9
21
Service Bulletin: No
7
6
Spinner
17
15
Systems
1
0
Training
3
Vertical Stabilizer
23
31
Wings
100
146
Copyright © 2001-2024 Matronics. All Rights Reserved.