KitLog pro

Powered By Kitlog Pro v2.0

Dan's Web Site
' style=
Date:  2-4-2006
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Pre-Drill Pilot Holes in Side Rails for Plexiglass

Just a couple of picture of the WD-725 side rails drilled and clecoed to F-631A channels...I need to break out the Acetone and cleanup all of the duct tape residue from all of the canopy install iterations,,,once I'm sure there will be no more iterations that is!I measured out the pattern for the screws that will eventually fasten the plexiglass to the side rails. I then drilled #40 pilot holes for now.
' style=

WD-725 side rails drilled and clecoed to F-631A channels

WD-725 side rails drilled and clecoed to F-631A channels

' style=

WD-725 side rails drilled and clecoed to F-631A channels

WD-725 side rails drilled and clecoed to F-631A channels

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.