KitLog pro

Powered By Kitlog Pro v2.0

Dan's Web Site
' style=
Date:  12-20-2005
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Clamp/Drill Right Side Rail

Clamping and drilling the right side rail went a little quicker than the left. The entire canopy frame is drilled together now with the exception of one side of the C-704 splice plate at the top of the C-631 channels. This will be done once the plexiglass is in place when the channels can be pushed upwards and outwards against the plexi.
' style=

Aft end of right side rail drilled to F-631 channel

Aft end of right side rail drilled to F-631 channel

' style=

Forward end of side rail drilled to WD-716 frame

Forward end of side rail drilled to WD-716 frame

' style=

Canopy frame drilled

Canopy frame drilled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.